Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 15 of 1370

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 In progress

Please add an Innovyze section to the autodesk forums

Hello, Innovyze previously had a forum available for their products. After the software was purchased by autodesk, this no longer seems to exist. I believe having a forum where users can post questions and troubleshoot their issues would be very h...
Endrit Shabani almost 2 years ago in InfoWater Pro / Other 2 Gathering support

"Initially Closed" and "Check Valve Direction" symbology should adhere to the "show inactive elements" toggle

This is simple enough to do by adding a definition query on the MOTYPE field in conjunction with the existing DSPCODE filter, but currently I would have to manually change this for 4 layers every time I toggle display of inactive elements.
Eric King 11 months ago in InfoWater Pro / Other 1 In progress

Delete Vertex in Pipe

I would like to be able to remove vertices from a pipe. Currently, you can only move the vertices or redraw the pipe. This process takes a while on big models and makes the distribution network more complicated.
Guest 6 months ago in InfoWater Pro / Other 0 For Review

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support

Update Scenario Explorer terminology to match Run Manager

Modelers can use the "General" tab in the IWP Scenario Explorer to assign specific Report, Simulation and Time options to a scenario. To avoid confusion, the label shown in the Scenario Explorer should be changed to match the Run Manager.
Michael Kane over 1 year ago in InfoWater Pro / Other 0 Gathering support

Have a costs library available under the rehab actions page

With this functionality, users could have an estimated cost for all assets in their system as soon as they run the rehab tree. This eliminates additional data input and management making the cost reporting much more efficient specially for those u...
Martha Nunez about 2 years ago in Info360 Asset / Rehab actions & cost 0 Gathering support

Use consistent terminology in the Fireflow Results Report

The Fireflow Results Report uses the following terms for what I believe are the same thing: Total Demand, Design Flow, & Fire Demand. If these are not the same in the context of this report then explain their differences. Also, the term "Hydra...
Guest 9 months ago in InfoWater Pro / Other 0 For Review

Report manager should populate without running model

Currently, the report manager is only populated once results are shown. This makes it so that the only place I can view the model data before running, is the data base manager. You should be able to have the report manager populated without runnin...
Endrit Shabani over 1 year ago in InfoWater Pro / Other 0 Gathering support

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King 11 months ago in InfoWater Pro / Other 0 For Review