Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 16 of 1370

VSP Control based on Tank Head/Level

Currently you can only use Junction Pressure setpoints or Pump Flow setpoints in the VSP Control dialogue. It would be helpful to be able to use a Tank Level/Head setpoint to adjust the pump speed as well. This is possible in competitor products l...
Grant Clemens over 2 years ago in InfoWater Pro / Operational Modeling 3 Under consideration

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest 12 months ago in InfoWater Pro / Operational Modeling 1 Under consideration

Pressure Relief Valve

Which valve, if any, would represent a pressure relief valve? Where the pressure on the upstream is not allowed to exceed a certain psi. If it exceeds the specified pressure on the upstream side the valve will open.
Guest 11 months ago in InfoWater Pro / Operational Modeling 2 For Review

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support

Group InfoWater Pro pumps into a pump station object that aggregates results

As a modeler I want to summarize the behavior of a pump station of multiple pumps using a polygon. This helps me summarize energy usage and total flow without needing to select arbirary upstream or downstream objects. This also helps simplify syst...
Guest about 4 years ago in InfoWater Pro / Operational Modeling 1 Gathering support

Initial Tank Levels

It would be great to be able to change the initial tank levels without having to create a whole new tank data set or putting a duplicate tank in the current data set. That way, the initial tank level condition can be changed for any given scenario...
Guest about 6 years ago in InfoWater Pro / Operational Modeling 4 Will not implement

Display linked live data in long section view

When calibrating a model with multiple pressure loggers, it would be useful to see reference HGL's in the Long Section view at any points with live data. This could be represented as floating points based on the current timestep. This helps unders...
Nathan Gerdts over 2 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Enhancement of the CSV option for Live data configuration

currently it is possible to use a csv in the live data file for a single set of data, however most it would be useful if you could have a csv with date time down the side and multiple flows or pressures across the way (Header row of Date Time, Pre...
Duncan Allen over 1 year ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Smart meters

Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution ...
Guest almost 6 years ago in InfoWorks WS Pro / Data Exchange / Telemetry 2 Under consideration

Provide option to allow for several multipliers and use with selection sets

In addition to a global multiplier, sometimes you want to peak certain areas and selection sets with specific peaking factors. WaterCAD allows for this under their calculation options.
Michele Marston over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support