Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 660 of 1370

Increase RTC Comment Length and Configuration

Currently RTC Comments are limited to 69 characters and only appear within a single box that you need to scroll horizontally to read. Please allow comments to be much larger and have multi-line format so we can add useful comments and explanations...
Dave White about 1 year ago in InfoWorks ICM / RTC 1 Under consideration

Remember/Fix Toolbar positions

When moving window from fullscreen to half/split-screen all the toolbars are moved to fit half screen width. When returning to fullscreen the toolbars remain in their split-screen positions. This makes finding tools challenging, takes up more scre...
Matthew Paul about 1 year ago in InfoWorks ICM / Productivity 1 Under consideration

Export functionality for rain gage boundaries

Be able to export rain gage boundary polygon data to GIS formats (shp, gdb) for use in other platforms.
Guest 7 months ago in InfoWorks ICM / Export Data 2 Gathering support

I would like improvements for ICM with SWMM engine

add ICM SWMM functionalities that are already available in ICM with regular engine - Area take off - Population data - CN/Runoff coeff. lookup -Create dummy boundaries
Guest almost 3 years ago in InfoWorks ICM / SWMM 7 Gathering support

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 8 months ago in InfoWorks ICM / Results 0 For Review

Allow grid view produced by a SQL script to interact with GeoPlan

Allow grid view produced by a SQL script to interact with GeoPlan so users can right click on SQL elements and zoom to/navigate to the selection on the GeoPlan.
Karen Chu 8 months ago in InfoWorks ICM / SQL 4 Gathering support

Adding Level 2 water quality capabilities to the ICM UPM tool

The current UPM tool only allows for completion of level 1 water quality impact assessments. We believe that our assessments would benefit greatly by having the additional functionality to complete level 2 water quality impact assessments. This me...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Increasing speed of UPM water quality tool

As part of SOAF, we are required to run CSO water quality analyses using 10-year simulations. Using these outputs in the UPM tool often takes a long time. Whilst the tool is running, the modeller cannot use ICM for completing other tasks. We have ...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker almost 3 years ago in InfoWorks ICM / Simulations 2 Gathering support