Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 442

RTC rules: order alphabetically

When copying rules, they appear in seemingly random order. When you have a lot of rules it can be very difficult to have an overview
Guest almost 3 years ago in InfoWorks ICM / RTC 0 Gathering support

Use ruby to edit rainfall dialogue box

Exporting rainfall files to csv for manipulation creates details of the storm events themselves, we would like to be able to change the return periods, durations, multiplying factors shown in the rainfall dialogue editor instead.
Guest almost 6 years ago in InfoWorks ICM / API / Exchange / Productivity / Rainfall 0 Gathering support

Integrate a Template option for setting out run group in Infoworks ICM

I am working on project which includes 50 models. where we have to give runs for different return periods and durations for each model. It is a time taking process, which unnecessarily create chances of error by creating run setup every time. is i...
Mohit Gupta over 5 years ago in InfoWorks ICM / Productivity 0 Gathering support

I would like to be-able to reorder scenarios in the drop down in ICM

II would like to be able to change order of scenarios (after Base). So be able to move up scenarios or down scenarios in the drop down list. I often have to delete scenarios or created amended versions of copied scenarios and this often results in...
Guest almost 5 years ago in InfoWorks ICM / Scenario 2 Gathering support

Provision of a separate ICM viewer installer

I work for a local authority where some people have higher spec machines than others yet most would, occasionally at least, find it useful to be able to view InfoWorks models/results. Installing the full version of ICM will likely be quite costly ...
Guest 11 months ago in InfoWorks ICM / Visualization 1 Gathering support

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

More flexibility for pdm runs

We would like to be able to simulate warmup and hydraulic simulations with different input sources. Now the run crashes if for example rainfall data does not match the saved state of the warmup run. It would also be very useful to make it possible...
Guest almost 3 years ago in InfoWorks ICM / Hydrology 0 Gathering support

Better functionality for multiruns

- number episodes in episode collection - sort runs according to number - greater timesteps for runoff only runs - resume with next run if a run fails - easy export of maximum results of runs (without results of the runoff only runs)
Guest almost 3 years ago in InfoWorks ICM / Simulations 0 Gathering support

Automated Calibration Tool

Tool similar to competing software where you can apply a level (%) of uncertainty and automatically sun simulations with varied parameters withing that level of uncertainty and see all results at once.
Guest over 5 years ago in InfoWorks ICM / Calibration 2 Gathering support

Possibility to turn off report windows

Now, when updating elements from ground model, extending cross sections, inserting an opening in a bridge… a report is displayed. This can be very annoying when building up a model and you have to click the report windows away. It would be useful ...
Guest almost 3 years ago in InfoWorks ICM / Mesh / Productivity 2 Gathering support