Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 778

Export Flood Profile from ICM to AutoCAD Civil 3D Profile file

While exporting to AutoCAD DWG file format is ok - we used AutoCAD Civil 3D for drawing profiles. Can you just create a Profile file? or use LandXML to represent this information. From the Autodesk Help: About the Format Requirements of Profile F...
Guest about 6 years ago in InfoWorks ICM / Long Section / Profile 1 Gathering support

Allow Customized Reports to Also Include Standard and Fireflow Results - Just Have One Result Table

Currently all model element information and results are separated between the DB Editor, Customizable Report, and Output Report/Graph. This is confusing and hard to export specific information together without having to combine it later in Excel o...
Joe Lawrence over 4 years ago in InfoWater Pro 1 Gathering support

Statistic Report Enhancement

Provide a way to enhance the statistical report to allow specific criteria above a threshold.
Guest about 6 years ago in InfoWorks ICM / Reporting / Statistics 0 Gathering support

Scenario assigned 'official' ID numbers within software

I would like for scenario names to be prefixed with a built-in ID number, in the same way that model commits have official version numbers, and wastewater and trade waste profiles have ID numbers. ICM clearly tracks ID numbers behind the scenes, s...
Jason Kulsdom about 3 years ago in InfoWorks ICM / Scenario 1 Gathering support

Ability to resize node layers in the map.

This is a spatial symbology enhancement to what has already been implemented. Alter the node size in the theme tool
Guest about 3 years ago in Info360 Asset / Customization / Styling / Layer Panel 0 Gathering support

Report showing history of simulation jobs running on server over a period of time

We are aware that ICM simulation jobs that are currently running on a simulation server can be viewed in the agent.state file in D:\Innovyze\InfoWorksAgent on the server. It would be great if there were a report that could show the history of ...
Mark Huxtable over 1 year ago in InfoWorks ICM / Statistics 0 Gathering support

Cluster High Risk Areas

Our risk analysis and project prioritization tools are great, but project prioritization won't be in Info360 immediately and may need some tweaking anyways. The attached paper summarizes the benefits Xylem saw in clustering high risk pipes. This c...
Tim Medearis almost 5 years ago in Info360 Asset / Customization / Styling / Map tools 0 Gathering support

Active/Inactive Network Elements

Ability to activate and inactivate model elements in InfoWorks as one can do in InfoSWMM.
Michael Wetterau about 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Add Data Sets to InfoWorks

Add Data Sets to InfoWorks as one can do in InfoSWMM. Helpful when clients want to model alternatives scenarios and make last minute changes.
Michael Wetterau about 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest about 3 years ago in InfoDrainage 0 Gathering support