Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Export GeoTiff

Export Maximum flood contours should allow export to modern GeoTIFF formats rather than expensive ASC formats
Guest over 2 years ago in InfoWorks ICM / Productivity 1 Under consideration

Initial condition 1D setting value

For Initial Conditions 1D, InfoWorks ICM seems to specify 1) initial level(m AD) and inflow values at nodes for Nodes grid, 2) and initial depth (m) and flow values along the river reach for River Reaches grid. For river reaches grid, as an initia...
Guest over 2 years ago in InfoWorks ICM / InfoWorks 1 Will not implement

Possibility to get the results from all timesteps for every section of a river reach by Ruby scripting

Now there are only two options: get the results for all timesteps for the first section of the reach (results-method), or get the results at all sections, but only for the current timestep (result-method). I would like to be able to query the resu...
Michael Huybrighs about 3 years ago in InfoWorks ICM / Results 0 Gathering support

Consolidate Mesh Report in Product

While the meshing report for clip meshing has improved, it still provides a lot of debugging information mixed with creation data, and limited summary of the mesh. Please consider the following to facilitate model reviews. Summary Section (current...
Guest about 3 years ago in InfoWorks ICM / Mesh 1 Gathering support

Restore appropriate local folder settings after browsing a different database

In recent versions, local root settings are not restored when a different database is selected. In older versions, I think that local root settings are changed automatically and correctly depending on which database is open. However, recently, whe...
Miyuki Okuda over 2 years ago in InfoWorks ICM / Workgroup 1 Already exists

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Bram Stuurman over 6 years ago in InfoWorks ICM / Performance 1 Gathering support

Ability to select multiple upstream traces at once

It would be useful to be able to hold ctrl / shift / alt or another keyboard link to be able to visualise multiple upstream traces at once. So after one trace has been selected, we could hold a key down and make another selection and retain all tr...
Lydia Crowther about 3 years ago in InfoWorks ICM / Network 1 Gathering support

Please provide Intellisense to the SQL Editor in ICM

I want the SQL Editor to help me write SQL queries by color coding and autocompleting data, similar to Intellisence.
Guest about 7 years ago in InfoWorks ICM / SQL 0 Gathering support

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest over 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

WBNM Hydrology Method in ICM

Australian flood modelling user have requested access to the WBNM hydrology method inside InfoWorks ICM. WBNM is one of the endorsed methods in Australian Rainfall & Runoff and large numbers of historical studies use this method.
Guest over 6 years ago in InfoWorks ICM / Rainfall 0 Gathering support