Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoDrainage

Showing 34

Status Bar to report more significant figures

The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..
Guest over 2 years ago in InfoDrainage 1 Already exists

Import/export of asset data to/from CSV

DSD import/export for MicroDrainage exists but HydroWorks is now dead. A more generic import/export would be beneficial for exchange of information with other drainage simulation packages and with GIS systems for existing networks; something simil...
Guest over 2 years ago in InfoDrainage 1 Already exists

Snap tool for areas

Just like in CAD DrawNet you can use the CAD tools to snap the points of the catchment areas to specific points, it would be useful to have a snapping tool built into the MicroDrainage program. It could be a simple tool so you can either put a new...
Guest over 2 years ago in InfoDrainage 1 Already exists

Velocity and proportional velocity to be shown on Tables

When designing sewers a critical design criteria is the pipe velocity when full or at design discharge rate. It makes designing sewers quite iterative without this included
Guest over 2 years ago in InfoDrainage 1 Already exists

Improve Snap Marker visibility

Improve the Snap marker visibility as they blend into the object making the snap markers nearly invisible
Guest over 2 years ago in InfoDrainage 1 Already exists

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing 11 months ago in InfoDrainage / Reporting 3 Already exists

Approximate storage sizing for each individual SuDS /storage feature, so you can review the landtake for each solution and whether it would fit in the site without having to build a network model

Similar to Source Control
Guest over 1 year ago in InfoDrainage / Other 1 Already exists

Excel export of pipe results

when outputting drainage schedules ( the default used in InfoDrainage is no good as lots of information cannot be selected) there was a simple and effective way of exporting the relevant info ( pipe number/diameter/gradient/us il/ds il/ cover leve...
Steven Gilchrist almost 2 years ago in InfoDrainage / Productivity 1 Already exists

When drawing infiltration trench, let me hold shift to invert which side of the trench i draw first

When drawing the trench, it is usally easier to draw the side along which im working against (IE a footpath edge) first, and then the width. Othewise i then have to rotate the object. Allow a user input by holding shift while drawing to allow user...
Guest almost 2 years ago in InfoDrainage / Productivity 1 Already exists

Easier selection of FEH and FSR Rainfall in the "Seasonal Return Period Wizard"

Sometimes we are required by the LLFA to run storms <60mins with FSR rainfall and storms >60mins with FEH rainfall. This requires the "Seasonal Return Period Wizard" to be run twice following changes to the network and then exported in separ...
Guest over 2 years ago in InfoDrainage 1 Already exists