Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 380 of 1442

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest over 1 year ago in InfoDrainage / Productivity 1 Gathering support

Hybrid gravel and crate soakaway option

We would like a Stormwater control (soakaway) feature that allows for a narrow gravel trench below a crate layer within the same soakaway, we have tried modelling as two separate features but the interaction between the two systems isn't accurate ...
Mark Jennings 9 months ago in InfoDrainage / Hydraulics 0 For Review

Outfall Elevation Curve Time Series

Please add the ability to input decimal places for the Time in the Outfall Elevation Curves. Currently InfoDrainage only accepts whole numbers.
Guest 9 months ago in InfoDrainage / Hydraulics 0 For Review

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

roll back commit history

We can see what the commit history is, but if you made a mistake and committed it there's no way to go back without making a new branch. Would be good to be able to roll back changes to a selected point in the commit history so your mistake isn't...
Ben Davies almost 4 years ago in InfoWorks WS Pro 1 Gathering support

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Operations 0 Gathering support

Add million imperial gallon unit for Reservoir Curve Volume

Check attached picture
Mohammed Abdallah over 1 year ago in InfoWorks WS Pro / Productivity 3 Gathering support