Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 431

Post processing scripts as part of a live simulation

We need to be able to automatically run scripts at the completion of our forecasts. it would be extremely helpful if we could have these scripts as part of the manifest workflow so that they started as soon as the results export task completed.
Richard Body over 5 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support

RORB Hydrology Method in ICM

InfoWorks ICM currently has the RAFTS Hydrological Routing method, but as a flood modelling user, I would like access to the RORB method as an option inside ICM. It is a similar method to RAFTS and would help endorsement of the software where RORB...
Guest about 5 years ago in InfoWorks ICM / Hydrology 0 Gathering support

Change coordinate system of a model more easily

We have a large project running for several years and our design team is working in one coordinate frame. Our clients models are all in another coordinate frame. Our team would like to reproject the models into the design coordinate frame but ther...
Guest about 4 years ago in InfoWorks ICM / Productivity 1 Gathering support

Retain decimal places when copying/pasting grid values

For most numerical values in a model, ICM can hold 8 decimal places. From the grid view, if you copy/paste a single cell value, the full set of decimal values are preserved. However, if you copy multiple cell values at once (e.g. an entire column)...
Jason Kulsdom over 2 years ago in InfoWorks ICM / Grids / Reporting 0 Gathering support

Rating curves / equations as downstream boundaries

At the moment we can use 'user control' links to act upstream of the DS boundary. These links have head/flow/power as their inputs. It would be useful to have a dedicated object that could be either a look up table of levels (rather than heads) an...
Richard Body almost 6 years ago in InfoWorks ICM / Events / Hydraulics 0 Gathering support

Remove "Delete simulation" option from "Results Manager"

Within the "Results Manager" window, "Delete time-varying results files" and "Delete all results files" are very useful tools - with this being the go-to method within my team for removing no-longer-needed results files. However, I have never seen...
Jason Kulsdom about 2 years ago in InfoWorks ICM / Simulations 3 Gathering support

Sim Slots

There should be an option to select to limit sim slots to be used by a model so other models dont go in waiting when running sims simulataneously .
Guest almost 5 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

4K Screen

Not everything works well with 4K monitors (grips). Let's get real 4K workflow - not just a DPI scaling solution.
Guest over 1 year ago in InfoWorks ICM / Productivity 0 Gathering support

Multiple river section results

It would be great if multiple river sections could be selected and if it was then possible to produce multiple object graphs from these and by extension do exports.
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

I want Long-Sections of a pipe to show the unconnected pipes which cross

On a Long-Section of a pipe, I would like ICM to show the unconnected pipes which cross that long-section. This would illustrate potential pipe clashes. I imagine the unconnected pipes would be shown as circles on the long-section similar to how...
Guest almost 5 years ago in InfoWorks ICM / Long Section / Profile 3 Gathering support