Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi over 2 years ago in InfoWorks WS Pro / Other 0 For Review

Default Symbol and Map Display

Please allow the option to choose the default symbol (InfoWater Model Preferences) and Map Display symbol from the "Styles" built into ArcGIS Pro. Both ESRI and my company have custom .stylx files that house our custom symbols for points, polyline...
Joe Lawrence over 5 years ago in InfoWater Pro 1 In progress

Create a mobile app

Create a mobile app for info360.com
Guest over 5 years ago in Info360 Insight 0 Will not implement

Add Alternative Demands to ICM

Add alternative demand feature (as exists in WSPro) so the impact of different growth (population) scenarios can be easily tested without having to create a new scenario and copy of the network for each iteration.
Alison Ormsby over 2 years ago in InfoWorks ICM / Grids 2 Gathering support

TSDBs to produce logs of SQL queries

This is important to assist troubleshooting issues related with TSDB performance during implementation and maintenance of TSDBs. The log should include the exact queries produced by their streams when data is updated.
Guest over 5 years ago in InfoWorks ICM / SQL / Time Series DB 0 Gathering support

Add Telog integration

We would like to have our Telog sensor data pulled directly into Info3460
Guest over 2 years ago in Info360 Insight / Integrations 0 Gathering support

Be able to track battery usage from IoT devices

Can we do this? If the IoT device can transmit battery available, could we display it? Would be nice to see a dashboard of devices with low power and be able to generate a work order when necessary. Trimble Unity is currently doing this with their...
Tim Medearis over 5 years ago in Info360 Insight 0 Will not implement

Increase amounts of alert Criteria - so you can have alerts on time series data, not just set values

Adding additional alerts options to the alert criteria capabilities Sensor Flatline, drift, on/off, rate of change (drastic uptick of flow or pressure).
Guest over 5 years ago in Info360 Insight 0 Under consideration

Adding a Water Calcs tool under the tools page

a tool with pre-built standard water calculations often used; maybe to interpolate C factors for a pipe based on recorded velocities, or average water loss on an asset based on flow meter 1 vs flow meter 2; or something hydraulic detention time ba...
Guest over 5 years ago in Info360 Insight 0 In progress

Updating a model in ICM Live is overly complicated and currently results in loss of data from previously ran simulations

The current process to update a model in ICM live is overly complicated and is currently not simple to grasp. This currently requires the removal of all runs from a particular manifest before you can remove and update the model being used. A simpl...
Guest over 5 years ago in InfoWorks ICM / Live Modeling 0 Gathering support