Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 146

Sort selection sets/ re-order them

Would be very useful if you could either sort selection set orders or move selections up or down the list. This would make it much faster to find the selection set you want in a large list (e.g. DMA selection sets in alphabetical order)
Duncan Allen over 5 years ago in InfoWorks WS Pro 1 Gathering support

Improve Theme Symbol Support

While setting up a custom theme to align WS Pro more closely to our GIS, I've found the support for symbols quite limited, and think these would be worthwhile improvements: Support the use of custom SVG icons, and/or Support the use of non-system...
Dave Watts about 1 year ago in InfoWorks WS Pro / Other 0 Gathering support

Copy all the scenarios from a Model

I would like to make a subsystem copy of a model (with different scenarios) that brings all the scenarios to the new model when I make a copy of the selected nodes and links. At this moment, a copy only brings the current scenario. Thanks
Juan Carlos Ortega over 3 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Horizontal surge tank equivalent diameter

I also am still assuming that if I want to model a horizontal tank, you must put in an equivalent diameter not the actual diameter.
Guest over 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest about 6 years ago in InfoWorks WS Pro 0 Gathering support

I want combine Critical Link Analysis with multiple scenarios

Today I can only select 1 scenario when running a critical link analysis run (or maybe general multi runs). I want to be able tot select multiple. This way, if I have 5 scenarios, I do not have to create 5 separate runs to check criticality of all...
Caroline Heylen over 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Field construction year reference for simulation run.

The field construction year of each object type from WS Pro are not linked to the simulation runtime, so you can get information for future infrastructures that you need to move away from your model or transfer to a new model or scenario. It wo...
Guest over 2 years ago in InfoWorks WS Pro / Engine 1 Gathering support

inlet riser option for tank

Have an option to specify an Inlet Riser Pipe for the tank element. This would hold the fill head at a constant, set at the riser pipe elevation, but allow the tank discharge head vary with the tank level.
Guest about 5 years ago in InfoWater Pro / Engine 1 Gathering support

Improve model maintenance

As a user I want to be able automate my model build maintenance activity so that my hydraulic model always reflects the asset repository
Guest over 6 years ago in InfoWater Pro 1 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support