Showing 279 of 1370

Improved tutorial for setting up a network

InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullie...
Guest about 3 years ago in InfoDrainage 1 Under consideration

Enhance InfoDrainage Long Sections

No description provided
Guest about 3 years ago in InfoDrainage 1 In progress

Sewer Design - Locking gradients

It would be useful if you could lock sewer gradients or manhole relationships so that if you changed an upstream level it would automatically amend downstream levels
Guest about 3 years ago in InfoDrainage 1 Gathering support

Interpolation of levels

It happens too often that while merging different models, you suddenly need a different timestep for your level-file. The only way to do this now, is remake your level completely. It would be better to (when changing the timestep of your level) IC...
Guest over 5 years ago in InfoWorks ICM / Events / Productivity 1 Gathering support

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 2 years ago in InfoDrainage / Productivity 2 Already exists

Allow underdrains to be displayed in the connection tables and add pipe number to them

It is very difficult to create a quick and logical pipe schedule when pipes such as underdrains are hidden in the SuDS nodes and their upstream invert level needs to be calculated manually. Please add the underdrains to the connection tables with ...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Infiltration Trench using BRE DIGEST 365 method

The software needs to support for designing Infiltration trench method by using “BRE DIGEST 365”. I have checked the comparison between Infodrainage analysis Vs BRE digest 365 (manual calculation) and the results are not matching. Most of the proj...
Guest almost 2 years ago in InfoDrainage / Hydraulics 8 Gathering support

Swale with pipe under connected by manholes

Could not model real-life scenario where the pipe was under as conveyance for lesser events and raised via vented manholes into the swale above. Need integrated solution and was unable to model both and connect via manholes.
Guest almost 2 years ago in InfoDrainage / Hydraulics 1 Already exists

Implement the Inflow Time Series Scaling Factor in InfoWorks from ICM SWMM

Scale Factor In ICM SWMM or SWMM5 a multiplier is used to adjust the values of the constituent's inflow time series. The scale factor can have several uses, such as allowing one to easily change the magnitude of an inflow hydrograph while keeping ...
Robert Dickinson almost 2 years ago in InfoWorks ICM / Flow 0 Gathering support