Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 145 of 1370

Copy all the scenarios from a Model

I would like to make a subsystem copy of a model (with different scenarios) that brings all the scenarios to the new model when I make a copy of the selected nodes and links. At this moment, a copy only brings the current scenario. Thanks
Juan Carlos Ortega about 3 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Automatically add network details when copying a network from commit history

When a version of a network is copied via the commit history dialog box, the standard commit detail generated is "created from copy". Could this be extended by automatically inserting the original network name and version number ? It would help a ...
Guest over 5 years ago in InfoWorks ICM / Network / Productivity 0 Gathering support

Copy/Paste Run Setup messages

Currently you cannot copy/paste setup error/warning messages from the Schedule Hydraulic Run Window in order to further investigate. This feature would be particularly useful for troubleshooting more complex runs ie TS.
Guest about 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

Field construction year reference for simulation run.

The field construction year of each object type from WS Pro are not linked to the simulation runtime, so you can get information for future infrastructures that you need to move away from your model or transfer to a new model or scenario. It wo...
Guest about 2 years ago in InfoWorks WS Pro / Engine 1 Gathering support

Sensor Objects for maps and comparisons

I want to see and interact with my sensors on the map. These could be generated from existing Live Data Points on model objects, and/or imported from GIS and joined spatially to model objects. Sim results could store the sensor data for the Run pe...
Nathan Gerdts about 1 year ago in InfoWorks WS Pro / Telemetry 0 For Review

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest almost 6 years ago in InfoWorks WS Pro 0 Gathering support

support MS SQL 2022

support MS SQL Server 2022 on Windows Server 2022
Jane Liu about 1 year ago in InfoWorks ICM / InfoWorks 1 Already exists

Implement an optimising tool back into WS Pro

Develop an optimiser tool similar to the InfoWater Designer tool for WS Pro. Optimatics Optimiser is expensive so does not allow all of the market access.
Guest about 1 year ago in InfoWorks WS Pro / Automation 0 For Review

The ability to create multiple Selection Lists at once

I am currently working on a model with a large number of DMAs. This means I have to select each specific area, and save this as a selection list - so I can easily identify areas in the future. This is a very time consuming task, and the ability to...
Sam Bonnington over 2 years ago in InfoWorks WS Pro / Automation 1 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest almost 5 years ago in InfoWorks WS Pro / Other 0 Gathering support