Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 162 of 1442

Open/Closed Valve Control - Live Data

When using an open/closed valve, setting a time profile to describe the opening and closing pressures, it would be useful to be able to load values form Live Data. It should be possible to connect the valve to 2 different live datas: one live data...
Paolo Boiardi over 1 year ago in InfoWorks WS Pro / Engine 0 For Review

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith almost 5 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Demand Area Analysis for partially metered areas

Demand Area Analysis was originally intended for networks where the unprofiled demand was unmetered. When domestic (unprofiled) metering became more prevalent Innovyze introduced “Current Average Specific Consumption (l/p/day)” in the calculation ...
Guest over 1 year ago in InfoWorks WS Pro / Productivity 2 For Review

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest about 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg almost 2 years ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam almost 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub almost 2 years ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest almost 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest almost 6 years ago in InfoWorks WS Pro / Operations 0 Gathering support