Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 216 of 1370

Live integration with ArcGIS Online

When updating a risk and rehabilitation model, users would like to make sure the data they are using is up to date. Much of this data such as roads, parcels, waterbodies, etc. comes from their GIS systems which get updated quarterly, semi-annual, ...
Martha Nunez over 1 year ago in Info360 Asset / Esri 1 On roadmap

Add a result grid window for cross sections

Currently there is not a grid results window to show all cross sections. Would be helpful to have one. Also would be good if the grid window can show geometric elements of each cross section, such as bank levels, flow area, wetted perimeter, hydra...
Guest over 4 years ago in InfoWorks ICM / Grids / Results 0 Gathering support

Zoom (flexible) graphs once x-axis values set

When using flexible graphs (including obsevered predicted, etc) in ICM, there is the possibility to specify the x-axis extents (i.e. time and date) explicitly via the data dialogues. However, once I have specified them this way, the traditional zo...
Iain Scott 7 months ago in InfoWorks ICM / Results 0 Gathering support

Ability to update and/or overwrite a spatial layer

Currently the user needs to delete the layer and re-import a new one. There should be an 'update' uption for all spatial layers.
Martha Nunez about 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 Gathering support

Ability to add a customer line on a graph

It would be nice if you had the ability to add a line on to a graph at a specific interval on the axis. This would make it easier to visual if a specific level has been reached, for instance.
Alex Grist 7 months ago in InfoWorks ICM / Results 1 Gathering support

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker over 1 year ago in InfoWorks ICM / Results 2 Already exists

Skeletonize water distribution asset network to simplify asset risk and rehab modeling

Don't want to do risk/rehab on all mains. Would like to aggregate / combine assets based on a set criteria and perform risk and rehab on those combined asset classes. Filter management does not quite work ATM.
Tony Andrews 11 months ago in Info360 Asset 0 Gathering support

Build your own expression for risk model total risk calculation

Specific request has come in from EPCOR. Requires follow-up As a user, I want to build my own expression when creating a risk model. For example, I want to bias the model myself and then normalize to 100. Total risk = ((LOF * 0.3) + (COF * 0.7)) *...
Mike Maylone over 2 years ago in Info360 Asset / Risk Configuration / Calculation 0 Under consideration

Map with bookmarks

One of the great things about a map is the ability to "quickly" jump from one area to another. We've somehow lost this basic function by utilizing the new mapping platform. I work for a utility that has both a north and south section with a huge c...
Guest over 1 year ago in Info360 Asset / Map tools 1 Gathering support

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest about 5 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support