Skip to Main Content
Autodesk
ADD A NEW IDEA

Results

Showing 47 of 1170

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest over 3 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake over 4 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Matt Anderson 12 months ago in InfoWorks ICM / Results 1 Gathering support

Statistical Analysis of ARR Temporal Pattern Ensembles should be enabled

Infoworks ICM should aim to facilitate statistical analysis of temporal pattern ensembles of ARR with a single click. Easily accessing and reviewing the statistical parameters for the required temporal pattern ensembles will allow Australian users...
Guest 8 months ago in InfoWorks ICM / Results 0 Gathering support

Allow for the running of statistics templates and generation of grid reports such as RPA and worst case using ICM Exchange

No description provided
Guest over 4 years ago in InfoWorks ICM / API / Exchange / Productivity / Results 0 Gathering support

Export Max Flood Contours - Elevation

It would add value to ICM if users could export the Maximum Flood Contours as Elevations in the same way that we can for Depth. This would be particularly useful as currently Depth is the only property that be be exported as an ASCII Grid file. I...
Guest over 3 years ago in InfoWorks ICM / Export Data / Results / Sharing 2 Gathering support

Model results as TVD connectors

We'd like to have model results as an input in the TVD connectors. An example is where we have observed flows that we would like to use at a tributary and then switch to catchment flows when the observations run out. We know this can be done using...
Richard Body about 4 years ago in InfoWorks ICM / Calibration / Results / Sharing / Time Series DB 0 Gathering support

Add a result grid window for cross sections

Currently there is not a grid results window to show all cross sections. Would be helpful to have one. Also would be good if the grid window can show geometric elements of each cross section, such as bank levels, flow area, wetted perimeter, hydra...
Guest about 3 years ago in InfoWorks ICM / Grids / Results 0 Gathering support

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest about 4 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Export statistical template results automatically as part of the manifest.

Particularly CSO spill statistics - enabling models to be run maybe weekly with historical data, the statistics exported - spill nr, duration and particularly predicted volume. This data can then be analysed in tools outside of ICMLive. This data ...
Geoffrey Brown almost 2 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support