Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 169 of 1370

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi almost 2 years ago in InfoWorks WS Pro / Other 0 For Review

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 2 years ago in InfoWorks ICM / Results 2 Already exists

Enable re-runs for selected scenarios

With the new Reserved Run workflow I can re-run simulations with my latest changes quickly without needing to commit. However if I'm using scenarios in the run, WS Pro re-runs all scenarios every time, even if there weren't any changes. I want an ...
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Making a run in WS/WSpro now a (big) list of yellow warnings pop up. By using an optional selection of (run)validation items not anymore

Making a run in WS/WSpro the input always gets fully validated including items not used. Those items creates a (big) list (e.g. 81.273) of yellow warnings. Besides run/validation time causes this a list of not wanted necessary warnings which makes...
Jeroen Fietje over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

More user friendly management on toolbars

The standard position of the toolbars is all on top of each other. If you want to move a toolbar from its standard position, the compact toolbars turn into floating windows. Returning the toolbar back to its compact shape will also return the tool...
Hidde Galema about 2 years ago in InfoWorks WS Pro / Persona 2 Gathering support

Prevent tabs in Grid windows from always being hidden by scroll bar

The horizontal scroll bar at the bottom of the grid window occupies half the screen by default and needs to be constantly moved every time to access a common tab like pumps. Like EVERYTIME you close the window. It is actually a huge pain and shoul...
Casey Shannon about 2 years ago in InfoWorks WS Pro / Productivity 1 Gathering support

Flags for tracing and long section

Placing flags at any node and having a "connect" button based on network connectivity leads to a big increase in workflow productivity. Flag tracing can be very useful for long section selection, upstream tracing from pump stations, and long secti...
Casey Shannon about 2 years ago in InfoWorks ICM / Results 1 Gathering support

As a user it is good to allow tab windows to take it out to the second or third display

Tab windows are not allowed to move main window to second display.
Guest almost 5 years ago in InfoWorks WS Pro 0 Will not implement