Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 203 of 1370

Support 64-bit TAB exporter

Support the extended 64-bit MapInfo TAB exporter to remove the 2GB file-size limit on the export.
Krzysztof Tchorzewski 7 months ago in Other Product Ideas / Asset Management 0 For Review

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest over 5 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

InfoAsset Mobile - Report window View On Map highlight report location

From the Report Edit/View window, when a user clicks on View On Map from the ribbon, on the Map it would be useful if the map icon of the report flashed or was highlighted in some way to make it explicitly clear the location of the report from whi...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Mobile - Image / Sketch allow paste

When editing a Report, it would be useful to be able to paste an image (from clipboard, for instance a screenshot of another application) into an image/attachments control and/or paste into the 'Image / Sketch Editor' tool
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

InfoSWMM for ArcGIS Pro

No description provided
Guest about 6 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 7 Will not implement

Overhaul to the Hyperlinks system to allow attached data to be transportable

ICM and Infoasset databases offer a system that allow hyperlinked documents to be connected to the database. Primarily this to allow survey, as laid and other background data to be available to the user and is a powerful function that if used corr...
Guest about 4 years ago in InfoWorks ICM / Sharing / Transportables 2 Gathering support

Volume on a discharge graph with results section

When we display the graph of the discharge (flow through line) of a results section (line object), we don’t have access of the information about the volume (usually when we display a discharge graph, the volume is indicated at the bottom of the gr...
Guest over 3 years ago in InfoWorks ICM / Results / Visualization 0 Gathering support

Seamless Import/Export of Civil 3d pipe networks into ICM.

Seamless Import/Export of Civil 3d pipe networks into ICM. It just make sense now the companies are joined rather than having to work-around/manipulate data between the two.
Gregory Smith almost 4 years ago in InfoWorks ICM / Data Exchange / Export Data / Import data / Sharing 3 In progress

Allow Simulation Time and Reporting Time to set independently

Similar to the functionality available InfoWSWMM where you are able to define a start date and time for the simulation and a start date and time for results. This allows initial phases of the model simulation to be ignored by the results without n...
Guest over 1 year ago in InfoWorks ICM / Simulations 2 Gathering support

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Guest about 2 years ago in InfoWorks ICM / Results 1 Gathering support