Skip to Main Content
Autodesk
ADD A NEW IDEA

Simulations

Showing 67

Rename Pages in Observed vs Predicted Graphs to Flow Monitor/ Depth Monitor nos

Provide way to rename Pages on Observed vs Predicted Graphs to Flow Monitor/ Depth Monitor nos. If there are considerable nos of FM/ DMs, an individual has to go through page nos to find out which FM is checked/verified. Facility to rename the pag...
Salam Jamadar over 3 years ago in InfoWorks ICM / Productivity / Results 1 Gathering support

Different Timesteps for Run-Off only for Episode Collection

For models that need significant run time up for antecedent conditions, or for long-term continuous rainfall simulations where we just need specific events for the network results, we have found the episode collection with run-off only between eve...
Niall Bassett over 1 year ago in InfoWorks ICM / Simulations 0 Gathering support

Background tasks overall progress visible in ICM

I think waiting for ICM to finish the task without having an idea about when this might be is not productive at all. Tasks like opening a simulation, graph something in the model, running a statistical template should be done accompanied by a load...
Ionut Pintea almost 5 years ago in InfoWorks ICM / Performance 1 Gathering support

Post processing scripts as part of a live simulation

We need to be able to automatically run scripts at the completion of our forecasts. it would be extremely helpful if we could have these scripts as part of the manifest workflow so that they started as soon as the results export task completed.
Richard Body about 5 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support

Show worst case analysis on long sections

I would like to be able to see the worst case across multiple simulations (highest water levels) along the 1d network when reviewing results. Essentially being able to visualize statistical report results in a long section.
Guest almost 4 years ago in InfoWorks ICM / Long Section / Profile / Results 1 Gathering support

Generate Stats reports as a background task

Generate Stats reports as a background task so User Interface isn't locked - as for simutations and meshing
Robert Woodall about 3 years ago in InfoWorks ICM / Performance / Results 0 Gathering support

Use TSDB data streams in flexible graphs

Currently, I can graph individual TSDB streams, or once a simulation has run compare a TSDB stream with modelled data at a particular node. But it would be helpful if I could compare TSDB streams with other TSDB streams, or with multiple model loc...
Guest about 5 years ago in InfoWorks ICM / Results 0 Gathering support

A Mesh Layer export function to facilitate the analysis and visualization of temporal mesh element results in QGIS.

I would like to see a Mesh Layer export function that would facilitate the analysis and visualization of temporal mesh element results in QGIS. Use case example: https://qgis.org/en/site/forusers/visualchangelog312/index.html#feature-vector-trace...
Guest almost 5 years ago in InfoWorks ICM / Export Data / GIS Layers / Results 0 Gathering support

Update Storage array from ground model

Provide the ability to update a storage array (curve) from ground model without destroying manually entered data
Guest over 5 years ago in InfoWorks ICM / Hydraulics / Productivity / Results 0 Gathering support

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 4 years ago in InfoWorks ICM / Performance 1 Gathering support