Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 202 of 1372

Persistent Graphs in InfoWater/InfoWater Pro

Stored graphs aren't that great. Why not just make graphs persistent?
Guest almost 5 years ago in InfoWater Pro / Productivity 2 Under consideration

Data Sets

It would be very helpful if, for any data set that is created by creating a clone of another data set, you could keep track of that. Perhaps a visually branched system of data sets to see if any of the sets were created based on another set. That ...
Guest almost 5 years ago in InfoWater Pro 1 Under consideration

Simple means to set initial storage area water surface elevations

Please incorporate a system for setting initial water surface elevations in storage nodes that works as easily as the process is in XPSWMM or HEC-RAS. The program should hold this water level during warm-up stabilization.
Guest almost 6 years ago in InfoWorks ICM / Hydraulics / Simulations 0 Gathering support

ICM sims updated with better control on sims outcome

I think waiting a big time for a sim to be done and then because the sim results disk gets full, loosing all of the simulated data is something that should be prevented from the time someone sends the simulation. A warning should be issued when yo...
Ionut Pintea about 5 years ago in InfoWorks ICM / Simulations 0 Gathering support

Horizontal surge tank equivalent diameter

I also am still assuming that if I want to model a horizontal tank, you must put in an equivalent diameter not the actual diameter.
Guest about 2 years ago in InfoWater Pro / Productivity 0 Gathering support

"Schedule Job(s)" request for extra functionality

At present, when two users each send a large batch of simulations to run on a remote PC via the coordinator, the coordinator is not very smart about allocating out resource to the simulations. For an extreme example, let’s say there is a remote...
Jason Kulsdom about 2 years ago in InfoWorks ICM / Simulations 0 Gathering support

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body over 5 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support

ICM - Statistics Template: Daily events

I want to be able to break my events into daily values. Currently this would require setting up 7 separate templates each with the unique day set under the 'Time Window' button. I want a tick option added that will allow me to do this within the s...
Guest over 4 years ago in InfoWorks ICM / Reporting / Results 1 Gathering support

I want Infoworks' "Export maxima to GIS" to include the below parameters to assist scour protection design within 2D Zone

1. For shear-stress-based design 1.1 Max Shear Stress (in N/m2 with at least 1 digit after the decimal point) 1.2 Hydraulic Slope at Max Shear Stress (in percent with at least 3 digits after the decimal point) 2. For velocity-based design 2.1. Max...
Phuong Mai over 3 years ago in InfoWorks ICM / Export Data / GIS Layers / Simulations 1 Gathering support

Improvements to custom DB table fields

1. Ability to modify the length of custom fields in the DB tables after they have been created. This is particularly a problem when you create a text field, but realize later it is too short. Another option would be to make the default text length...
Colin Ricks almost 6 years ago in InfoWater Pro 2 Under consideration