Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 769

Support for IPF files from 3D pipe or manhole inspections

These type of inspections are collected by a few CCTV inspector vendors. Cities use them to leverage their condition assessment practices.
Martha Nunez over 2 years ago in Info360 Asset / Import / Upload 0 Gathering support

Volume on a discharge graph with results section

When we display the graph of the discharge (flow through line) of a results section (line object), we don’t have access of the information about the volume (usually when we display a discharge graph, the volume is indicated at the bottom of the gr...
Guest over 3 years ago in InfoWorks ICM / Results / Visualization 0 Gathering support

View time-varying profile count of impacted customers for criticality runs

Critical Link Analysis is powerful for understanding the summary impact of pipe closures/isolation, but sometimes the impacts are immediate and sometimes they're delayed several hours as reservoirs drain. The timing of customer outage impacts is u...
Nathan Gerdts over 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Change pipe material based on inspections

Many utilities confirm or update pipe materials in their GIS data based on inspections; this is a feature that is possible within IAP. This was accomplished by comparing GIS materials to the imported inspection materials within the Validation tool...
Kim Solberg over 1 year ago in Info360 Asset / Data Editing 1 Gathering support

Different shape sluice or pipe/orifice closure option

We usually model closed gates as sluices, as they are the ones that can easily be closed (by setting the height to zero). The downside of this is that it can only be a rectangle (and it usually closes off a round pipe). An orifice now has the nice...
Marcel Glasbergen almost 3 years ago in InfoWorks ICM / Orifice / RTC 0 Gathering support

Better performance and functionalities of the recycle bin

In a workgroup database, the Recycle Bin today is more a nuisance than a useful feature. When there are too many items in it, it can delay the connection to the database considerably or even make it impossible to connect. The functionalities for s...
Guest about 5 years ago in InfoWorks ICM / Productivity 1 Gathering support

RTC - New time range to allow "between 2 dates" every year

In a similar way to the way "time repeat" works, can we have an RTC range that works between the same 2 dates every year. I have a catchment where the operating protocol works differently in the Bathing Season from the rest of the year. Having a w...
John Sourbutts over 6 years ago in InfoWorks ICM / RTC 0 Gathering support

Integration with Industry Cost Data (E.g. RSMeans) for Rehab Costs & Updates

Integrate with industry cost data source like RSMeans. User can link their rehab actions to labor, equipment, material costs which will automatically be keep updated by region.
Mike Maylone over 1 year ago in Info360 Asset 0 Gathering support

Conveyance on cross section lines

Provide cross section conveyance for each cross section
Guest over 6 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support

Promote recently used flags

It would help if your recently used flags were promoted to the top of the flags list. For example, I am updating flags for some manhole surveys (flagged "SM"). Alphabetically, SM is close to the bottom of the list which means I have to scroll to...
Benjamin Mauck over 4 years ago in InfoWorks ICM / Flags 2 Gathering support