Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1383 of 1383

Allow Simulation Time and Reporting Time to set independently

Similar to the functionality available InfoWSWMM where you are able to define a start date and time for the simulation and a start date and time for results. This allows initial phases of the model simulation to be ignored by the results without n...
Guest over 1 year ago in InfoWorks ICM / Simulations 2 Gathering support

Multiple Output Blocks for Analytics Configuration

Currently, output blocks can only provide one output. This means multiple output blocks are needed for multiple calculations in a single analytic. Output blocks should be able to provide multiple outputs to simplify the analytic configuration.
Javier Coronado 10 months ago in Info360 Insight / Tools / Analytics 0 For Review

Copy and Paste of Blocks within Analytics Configuration

To make editing analytics configuration easier, it should be possible to copy and paste data sources, constant values, and output blocks within the configuration.
Javier Coronado 10 months ago in Info360 Insight / Tools / Analytics 0 For Review

Adding Comments in Analytics Outputs Blocks

Like any code, comments should be added to any Analytic Output. This will facilitate the understanding of the calculations within the Analytic. I suggest that these comments should be added as a description within the output definition or as a tex...
Javier Coronado 10 months ago in Info360 Insight / Tools / Analytics 0 For Review

Pump Station Modelling

Infoworks ICM pump station modelling principle is very basic, adding a pump between two nodes is highly hypothetical. There is no way to add pump station head losses. I would like to suggest incorporating pump station modelling (for Rotodynamic pu...
Guest almost 4 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Enable the ability to review Debug Logs from external text editor

The internal Log results editor window is slow when loading over 100K lines. Needless to say - debugging a model where the debug log is 11 GB cant be done in the product, and the workflow to export to file is simply excruciatingly painful. As the ...
Guest about 2 years ago in InfoWorks ICM / Productivity 1 Gathering support

Add 2D result labels for ICM mesh elements

I would like to display the 2D results (depth, elevation, velocity) at each individual GRID cell using labels. This is currently available in XPSWMM, so I would like the same functionality in InfoWorks ICM as I would rather not have to export the...
Guest over 4 years ago in InfoWorks ICM / Labels / Results 1 Gathering support

Expanded use of the 'lining material' field

Pipes that are lined have to be updated in the GIS. Info360 Asset provides 'lining material' and 'lining type' fields. I think it would be beneficial to utilize this field in the risk analysis when assessing the 'pipe material' component to look a...
Martha Nunez over 1 year ago in Info360 Asset / Asset Deterioration Modeling 0 Gathering support

dendric numbering and table of results

its frustrating when interrogating and amending the pipe network, when the pipes and chambers are not in the same order, the way it was presented in MicroDrainage gave a clear path with the final outfall pipe being at the bottom, not randomly plac...
Steven Gilchrist over 2 years ago in InfoDrainage / Reporting 1 Under consideration

Drop down of flow paths in section view

It would be very handy if, in the long section view of flow path, there is a dropdown with the available flow paths in that phase, as happens on other table-like dialogs. This would not require the user to close the long section view to get to the...
Guest 11 months ago in InfoDrainage / Visualization 1 For Review