Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1375 of 1375

Need additional Timestep function for "Between episodes" of "Simulation runoff only"

It needs creating a new Timestep function in ICM Run window that allows setting up timestep for "Simulation runoff only" for the "Between episodes" separately with "Timestep (s)" in Run window. This new function saves a lot of running time when th...
Guest about 3 years ago in InfoWorks ICM / Events / Simulations 0 Gathering support

Play/Pause button

Current play and pause buttons (when viewing simulation results) are separate. I realise there are step buttons but if I want to start/stop quickly, whilst looking at the results instead of where the mouse is, then it's more convenient as a single...
Matthew Paul over 1 year ago in InfoWorks ICM / Productivity 0 Gathering support

CCTV inspections should have their own data grid

This request is for a dedicated data grid in which CCTV inspection hearder details should be viewable. Inspections can then be filtered, sorted etc. Even better if this data grid could be hooked up to a dedicated asset condition map integrated wit...
Tony Andrews over 1 year ago in Info360 Asset / Data Editing / Inspection & Media Management Workflows / Map visualization / Product workflows 0 Gathering support

Export InfoSurge results for external application

InfoWater can use the option to "Export simulation results for external application" to export selected results to DBF files. It would be nice to have this work for InfoSurge.
Colin Ricks over 4 years ago in InfoWater Pro 1 Gathering support

InfoAsset Manager: Condition grade profile

In InfoAsset Manager there is the facility to calculate a structural condition grade profile for each pipe (i.e. the % of the pipe in each condition grade). Currently this is only available for surveys scored using the MSCC. We originally collabo...
Guest about 3 years ago in Other Product Ideas / Asset Management 5 For Review

Integration with Lucity (Central Square)

Prioritized I360A action plan to be implemented and completed in CMMS - then once work is completed the equivalent work/project in I360A needs to be updated as complete. Different types of work orders for risk and rehab analysis, and for deteriora...
Martha Nunez over 2 years ago in Info360 Asset / Other 0 Gathering support

Incorporate greater flexibility in the creation of UDF maps from the Print Field Journal

The current Print Field Journal for UDF maps does not allow users to adjust the map size (relative to other elements in the PDF), which was an important feature for our client when using UDF with InfoWater (the map is the most important for them i...
Guest 10 months ago in InfoWater Pro / Productivity 0 For Review

Enable drawnet manhole changes

Enable the manholes assigned to impermeable areas on drawnet to be changed. It is currently not possible to change the manhole when editing a network meaning the areas have to be deleted then recreated. Being able to change the manhole would save...
Guest about 3 years ago in InfoDrainage 1 Already exists

Enable locking of pipe numbers

One of the aims of BIM is that all the different models you create match. If you issue a pipe network 3D model for construction with certain pipe numbering and then a minor change happens this can affect every pipe number in the system. But once i...
Guest about 3 years ago in InfoDrainage 0 Gathering support

Change the size / dimensions of multiple manholes at once

MicroDrainage Network It would be very useful if it was possible to change the dims of many manholes at once. It'a a very laborious and time consuming task to change each dimension one-by-one, especially if the network is very large!
Guest about 3 years ago in InfoDrainage 1 Already exists