Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Build your own expression for risk model total risk calculation

Specific request has come in from EPCOR. Requires follow-up As a user, I want to build my own expression when creating a risk model. For example, I want to bias the model myself and then normalize to 100. Total risk = ((LOF * 0.3) + (COF * 0.7)) *...
Mike Maylone over 2 years ago in Info360 Asset / Risk Configuration / Calculation 0 Under consideration

Adding MIN and MAX as functions within Analytic Tool

It is common practice, when calculating analytics from field sensors to leverage Min and Max to avoid miscalculations. For example, a sensor signal, when faulty, may become negative, while commonly having a positive value. To avoid this, a simple ...
Javier Coronado 11 months ago in Info360 Insight / Tools / Analytics 0 For Review

Export manager scope should include Selection Sets

Export manager "Element Scope" currently only allows All, Domain, and User selection for the scope of the elements to export. A combo box with the list of selection sets would be useful and likely easy to implement.
Colin Ricks almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Allow changing graphic order when creating historical charts

When building a historical chart, Info360 overlays the sensors in the same order as they are configured. When the visualization of a sensor is an area, and this sensor is not added first, then the area will overlay the trends for the other sensors...
Javier Coronado 12 months ago in Info360 Insight / Workspaces 0 For Review

Circular sluices/penstocks would also be useful

Similar to the rectangular flap valve request, circular sluices would avoid workarounds trying to estimate the rectangular equivalent to a half closed circular penstock (or worse still a half closed egg shaped penstock)
Geoffrey Brown almost 6 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Time of Concentration (TR-55) Calculator

Although the software has a TR-55 calculator for time of concentration, it doesn't work properly and also needs additional options added. Currently it isn't functional, because the software doesn't allow you to use only 1 or 2 of the 3 flow condit...
Nick Brewer over 1 year ago in InfoDrainage / Hydrology 2 For Review

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest over 5 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Forecast and calc channels for analytics

To benchmark process performance, customers require comparing pre- and post- efficiency enhancement. In the case of UU, they can compare theoretical (pre-AI) vs. eff. enhanced (post-AI) vs. recommended (AI). Forecast channels from emagin cannot be...
Javier Coronado over 1 year ago in Info360 Insight / Tools / Analytics 1 In progress

Add a storage structure feature for channel drains

Add a storage structure feature for channel drains (e.g. channel, slot drain, kerb drain) so that these features can be presented as storage and not only conveyance (by modelling a custom section) and so that catchments can be connected as a sheet...
Oliver Dodd over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Ability to apply blockage percent

Applying pipe blockage is a standard required in Australia and the functionality in ICM to do this is not user friendly (using blockage links). A simple % pipe blockage in the conduit properties should really be an option. This is particular the c...
Guest over 4 years ago in InfoWorks ICM / Hydraulics 3 Gathering support