Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Design settings which only allows backdrops in pipe diameters below 225mm diameter

No description provided
Guest over 3 years ago in InfoDrainage 0 Gathering support

Assess scenarios based on annual water balance (runoff, infiltration, evaporation)

Assessment of the annual water balance is an important criteria to evaluate drainage design at neighbourhood level. Functionality to assess scenarios in a chart (similar to typical pre-urban vs. urban) would save time in GIS-postprocessing
Guest over 3 years ago in InfoDrainage 0 Gathering support

"Copy to clipboard" alongside print/export on Microdrainage spreadhseet input/outputs

Would greatly simplify the process of getting results/details from MD into a report, skipping a stage in the current process (Export to CSV/Excel - Open)
Guest over 3 years ago in InfoDrainage 0 Gathering support

to be able to change the default button in storm duration

to be able to change the default button in storm duration so I can set up my own default settings
Guest over 3 years ago in InfoDrainage 1 Gathering support

Please can the output drawings be able to be produced in landscape.

When using the extend view to produce drawings it appears to be only able to undertake in portrait. Also the title block cannot be changed in size which can make the drawings untidy. Finally can there be an option to move the lables around so they...
Guest over 3 years ago in InfoDrainage 1 Gathering support

Infiltration Basins

The output tables for ponds doesn't include any infiltration outputs where the pond is an infiltration basin. The graphs show that there is infiltration but MicroDrainage used to include infiltration in the output table
Guest over 3 years ago in InfoDrainage 2 Under consideration

Be able to drag the grid window off main interface to another monitor.

Drag grid window to another screen, just like an attribute table in ArcMap/ArcGIS Pro. Allowing more relaxed and open use of grids, with much less scrolling through tight windows.
Guest almost 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 For Review

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest about 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Export both the result and the underlying property fields

When the model results are displayed on the webpage through Exchange, since the basic properties need to be viewed, the corresponding basic properties of the results need to be exported first, and then the results are matched to the basic properti...
Liu Qiusheng about 5 years ago in InfoWorks ICM / Export Data / Simulations 0 Gathering support

Convergence Errors be resolved automatically while the model is simulated

Sometime a TSR running for few weeks throws up convergence hence these sims need to be rerun with shorter timestep which is both inefficient and a lot of time is wasted. It would be good if somehow the simulations dialog allowed to run the model w...
Salam Jamadar about 5 years ago in InfoWorks ICM / Performance / Simulations 0 Gathering support