Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 942 of 1442

Add node level (hydraulic grade line) data to custom graphs for calibration

Allow for the ability to compare observed and predicted level data (or hydraulic grade lines) at nodes. Instead of depth in the pipe, I typically have water surface elevations at a node, specifically for treatment plant hydraulic modeling.
Guest over 5 years ago in InfoWorks ICM / Calibration / Labels / Results 0 Gathering support

InfoAsset Planner for ArcGIS Pro

As a user I want to upgrade from ArcGIS to ArcGIS Pro. When will this be available?
Guest over 6 years ago in Other Product Ideas / Asset Management 3 Will not implement

Increased number of user pollutants

We would like to be able to trace pollutant sources through our 2D model. The way to do this would be to use the user defined pollutants . But... at the moment there are only four pollutants and potentially we'd have many different sources that we...
Richard Body over 5 years ago in InfoWorks ICM / Pollutants / Water Quality 1 Gathering support

Better Video Encoders

The AVI recorder uses a Windows 11 unknown CODEC - update the video encoder to something modern!
Guest over 1 year ago in InfoWorks ICM / Performance 1 Under consideration

AutoCAD objects on Conversion

As a user, I would like InfoWorks to recoginze Civil3D objects as objects and not require me to resolve the model to dumb elements
Guest over 6 years ago in InfoWorks ICM / Hydraulics / Import data / Terrain 0 Gathering support

Include the volume of the downstram manhole ONLY if selected

Change behaviour of Storage Operations: Calculate total storage... function. The current behaviour is unintuitive and incorrect.
Guest over 1 year ago in InfoWorks ICM / Network 3 Under consideration

2D Result Long Profile results comparison

When doing flood study, XPSWMM had a cross-section tool that would show WSEL. While I can use US/DS profiles to compare two scenarions - I want to cut a long section along a 2D channel (and no I am not converting it to River Sections as it defeats...
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 1 Gathering support

snap river reach lines to cross sections

When creating river reach links the vertices should snap to cross sections so that vertices are only created on the cross-section lines (if vertices are to close on river reach objects you get meshing problems later on!) and is easier to follow th...
Guest over 2 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Allow Meshing Ids to not vary from scenario to scenario if "grading" is completed

Suggest maintaining some numbering scheme of clip meshing so if one proposal is regrading, we can perform a mesh zone comparison without resorting to a giant waste of time exporting to GIS to figure out the difference as each mesh element number g...
Guest over 1 year ago in InfoWorks ICM / Mesh 1 Gathering support

graph all sources on a singe graph in quality runs

The graphing tool in a quality run now only alows for two different sources. but I would like to know the consistency of water on any point in time of all defined scource nodes. E.G. the consistency of node X is 36% from source X, 13% from source ...
Pieter Piens about 4 years ago in InfoWorks WS Pro / Water Quality 0 Gathering support