Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 942 of 1442

Fix sim.status method return values

As a user I want a reliable way to determine when a simulation has finished using the sim.status method. Currently, we have been advised to use sim.status == 'None' to determine when a sim has finished, which works (somewhat) for local sims but no...
Oscar Holemans 24 days ago in InfoWorks ICM / API / Exchange 0 For Review

Import data into 1D initial conditions object via the Exchange

I want to be able to add data to a 1D initial conditions object using the Exchange. This could be either from a CSV file using import_data or import_new_model_object, or through some other method. I can import data into a 1D initial conditions fro...
Oscar Holemans 24 days ago in InfoWorks ICM / API / Exchange 0 For Review

Change subcatchment slope field to calculate correctly if non-numeric value used in Link Suffix.

When using InfoWorks ICM, if a network has a non-numeric link suffix in a conduit, the associated subcatchment slope field will not calculate. This results in a flat slope field and will affect run-off in simulations. Its not mentioned in the guid...
Tom Walker 4 months ago in InfoWorks ICM / Hydrology 0 For Review

Enable Exchange Ruby method for carrying out spatial analysis in Workgroup Products

SQL tool in InfoAsset Manager enables users to perform spatial analysis of a variety of types using a selection of layer types. This is an extremely important and useful analytics tool which avoids the need for a user to export data out of InfoAss...
Anthony Andrews 6 months ago in InfoWorks ICM / API / Exchange 1 Gathering support

We need Baseflow Profiles, similar to WWG and TWP, to represent summer and winter baseflow conditions. The industry is regularly using trade flows for this instead.

We shouldn't have to use 'trade' flows modulated by monthly multipliers to represent seasonally-varying baseflows. Users would benefit from baseflows being modelled in the 'baseflow' field. We should introduce a BIP (Baseflow Infiltration Profile)...
Saul Bradford about 2 months ago in InfoWorks ICM / Groundwater 1 For Review

Permeable paving needs to have a option for a different gradient at the surface to the gradient at the base.

This would allow a better representation of steep sites where we would otherwise lose a lot of storage, instead we can make the base flat to allow for more storage volume.
Guest 3 months ago in InfoDrainage / Hydraulics 1 For Review

Add Option for Rectangular Orifices

It would be great to be able to model orifices as either circular or rectangular like it is in XPSWMM. Currently, the workaround is to enter the rectangular orifices as sluice gates, but I'm not sure if this is the intended use of sluice gates.
Karen Chu 2 months ago in InfoWorks ICM / Orifice 2 Gathering support

Adding Babbit Formula

Requesting addition of Babbit formula peak factor calculation to Infodrainage program, providing comprehensive analysis for efficient and accurate design and decision-making since Babbit formula peak factor calculation method used in many standard...
Mohamad Azzam about 2 years ago in InfoDrainage / Hydraulics 2 Under consideration

Continuous Matched Soffits or Inverts Snapping

It would be useful if all pipes in a junction automatically snapped to match either soffits or inverts. There is a variable in the Network Design Criteria for 'Level Soffits' or 'Level Inverts' so potentially this option could be used for the live...
Ian George 3 months ago in InfoDrainage / Productivity 0 Gathering support

Empty the entire recycle bin for Autodesk Cloud Databases

This is already available for Workgroup databases. Deleting objects from the bin one by one is painful.
Saul Bradford 29 days ago in InfoWorks ICM / Productivity 0 For Review