Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 546 of 1372

Promote recently used flags

It would help if your recently used flags were promoted to the top of the flags list. For example, I am updating flags for some manhole surveys (flagged "SM"). Alphabetically, SM is close to the bottom of the list which means I have to scroll to...
Benjamin Mauck over 4 years ago in InfoWorks ICM / Flags 2 Gathering support

Pump Station Modelling

Infoworks ICM pump station modelling principle is very basic, adding a pump between two nodes is highly hypothetical. There is no way to add pump station head losses. I would like to suggest incorporating pump station modelling (for Rotodynamic pu...
Guest over 3 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Simulation engine control update

Since the beginning of ICM and allowing to send simulation to other computers in the network, there was a need for knowing exactly who is currently sending simulations and to which computer. Please update the ICM with this improved functionality f...
Guest about 6 years ago in InfoWorks ICM / Productivity 5 Will not implement

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Guest about 2 years ago in InfoWorks ICM / Results 1 Gathering support

Conveyance on cross section lines

Provide cross section conveyance for each cross section
Guest about 6 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support

Add 2D result labels for ICM mesh elements

I would like to display the 2D results (depth, elevation, velocity) at each individual GRID cell using labels. This is currently available in XPSWMM, so I would like the same functionality in InfoWorks ICM as I would rather not have to export the...
Guest over 4 years ago in InfoWorks ICM / Labels / Results 1 Gathering support

Add time/factor graph to SWMM time patterns editor

Trade waste and wastewater events include a graph showing the factor at each time. SWMM time patterns should also include this graph for interrogation of data.
Guest over 1 year ago in InfoWorks ICM / SWMM 2 Gathering support

Implement the Nash-Sutcliffe coefficient to evaluate the quality of the calibration

Developp this tool would help the customer to analyze their calibration and justify the used coefficients.
Guest over 4 years ago in InfoWorks ICM / Calibration 0 Gathering support

ICM InfoWorks SWMM5 Tools

ICM InfoWorks Networks has a long history of being both a great modeling platform but having a lot of SWMM5 features. To name a few, there is SWMM Runoff, SWMM Horton, SWMM Snowmelt, SWMM Green Ampt Infiltration, SWMM5 Water Quality, SWMM5 RTK, SW...
Robert Dickinson 10 months ago in InfoWorks ICM / Hydrology 0 For Review

Export statistical template results automatically as part of the manifest.

Particularly CSO spill statistics - enabling models to be run maybe weekly with historical data, the statistics exported - spill nr, duration and particularly predicted volume. This data can then be analysed in tools outside of ICMLive. This data ...
Geoffrey Brown about 3 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support