Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 126 of 1370

Improved Workflow for Labels

Our team finds map labels quite useful, especially as they are migrating from InfoWater where the use of map labels is quite common. Although the label functionality in InfoWorks WS Pro is quite good, working with them can be slightly unintuitive ...
Dave Watts 9 months ago in InfoWorks WS Pro / Productivity 0 Gathering support

Support SQLite / GeoPackage Data Formats in ODIC

It would be useful to import and export from structured, typed data in a container format - preferable SQLite and/or GeoPackage. The current import/export options are either untyped (e.g. CSV), require a database (Oracle, SQL Server), are SHP f...
Dave Watts 6 months ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Delete Vertex in Pipe

I would like to be able to remove vertices from a pipe. Currently, you can only move the vertices or redraw the pipe. This process takes a while on big models and makes the distribution network more complicated.
Guest 6 months ago in InfoWater Pro / Other 0 For Review

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini 10 months ago in InfoWorks WS Pro / Operations 1 Gathering support

Compare more than 2 results AND Long Section Legend

In MIKE + and other software, it is very easy to add more than one result to either a graph or a long section. It is nonsense that only two results can be compared in WS PRO or ICM. This is a huge downside, considering this is a planning tool, and...
Casey Shannon 7 months ago in InfoWorks WS Pro / Productivity 1 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support

Right click menu on objects to graph, trace, edit, etc. Similar to ICM

I want to interact with my model primarily from the map rather than relying on toolbars. Namely, I want to select an object and then access an action menu to graph, edit, trace, label, etc on that object. Note: ICM already supports this feature, s...
Nathan Gerdts 8 months ago in InfoWorks WS Pro / Productivity 0 For Review

Creating Demand scaling from the Demand Area Window

In 2024.5 it is possible to choose to 'ignore leakage' and to 'scale demands' when using the demand area analysis tool. The scaling is happening on the demand (consumption) in the network. This means I have to create a new network (or scenario) ev...
Caroline Heylen almost 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Improve SQL spatial search to join line objects based on overlap

GIS data often misses pipe splits or lacks suitable asset IDs in the model. Updating the model over time from changes in GIS would be improved by having an option to exchange data and flags spatially through SQL Query (after primary data exchange ...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Data Exchange 0 For Review

Toggle to sync view between Long Section and GeoPlan

I want an option to synchronize the view between the Long section and the Geoplan. When turned on, the geoplan will automatically zoom to the current visible set of links in my long section. If I zoom in/out on either the map or long section, the ...
Nathan Gerdts over 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support