Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 239 of 1372

Contours and Spot Elevation data for Elevation Extractor in InfoWater Pro

While rasters remain the best way to assign elevations throughout the model, InfoWater also supported other formats using interpolation such as contours and point elevation. Please add these file types in InfoWater Pro.
Guest about 4 years ago in InfoWater Pro / Data Exchange 0 Gathering support

Variable baseflow

(Could also be considered hydraulics) On large scale projects where we may have limited information and funding, we assume baseflow values through an upstream point inflow. It would be beneficial to have a variable baseflow input per design storm....
Jess Ewing almost 2 years ago in InfoDrainage / Hydrology 1 Gathering support

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest about 1 year ago in InfoDrainage / Productivity 1 Gathering support

Schematic for Dry Wells

When adding a dry well, it would be useful to provide some labelled images like those available for other stormwater controls to clarify what the properties are refering to.
Midori Patterson almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Ability to utilize an alternative asset ID for the Info360 Asset/Info360 Insight integration

Unfortunately, sometimes the InfoWater Pro model has different asset IDs compared to the source asset GIS. This makes the InfoWater Pro integration with Info360 Asset and Info360 Insight unusable when the source GIS is used in these products. The ...
Martha Nunez almost 2 years ago in InfoWater Pro / Data Exchange 0 In progress

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Access to UDF Data through DB Editor

In InfoWater Pro, the model data can be accessed through the DB Editor. The UDF tool does not have any access to the database tables through the DB Editor. It would be very helpful if I could gain access to the UDF tables through the DB Editor, ev...
Matt Huang about 3 years ago in InfoWater Pro / Data Exchange 0 Under consideration

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 1 year ago in InfoDrainage / Productivity 0 For Review