Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 34 of 1370

Add tool to convert coordinates

Similar to "Convert flow units" and "Convert pressure units" under"Tools", it would be useful to have "Convert Coordinate Units". Coordinates in InfoWorks are meter/feet. Other websites like google maps uses decimal degree. It would be useful to h...
Mohammed Abdallah over 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

Support variable speed in live data

Variable speed is now an unsupported attribute in live data.
Evi Loozen almost 6 years ago in InfoWorks WS Pro / Telemetry 2 Under consideration

user defined boolean fields

Ability to create user defined boolean fields in order to incorporate fields within corporate GIS system
Richard Robinson almost 6 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

I want combine Critical Link Analysis with multiple scenarios

Today I can only select 1 scenario when running a critical link analysis run (or maybe general multi runs). I want to be able tot select multiple. This way, if I have 5 scenarios, I do not have to create 5 separate runs to check criticality of all...
Caroline Heylen about 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Copy/Paste Run Setup messages

Currently you cannot copy/paste setup error/warning messages from the Schedule Hydraulic Run Window in order to further investigate. This feature would be particularly useful for troubleshooting more complex runs ie TS.
Guest about 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

Sensor Objects for maps and comparisons

I want to see and interact with my sensors on the map. These could be generated from existing Live Data Points on model objects, and/or imported from GIS and joined spatially to model objects. Sim results could store the sensor data for the Run pe...
Nathan Gerdts about 1 year ago in InfoWorks WS Pro / Telemetry 0 For Review

Demand Area Analysis for partially metered areas

Demand Area Analysis was originally intended for networks where the unprofiled demand was unmetered. When domestic (unprofiled) metering became more prevalent Innovyze introduced “Current Average Specific Consumption (l/p/day)” in the calculation ...
Guest over 1 year ago in InfoWorks WS Pro / Productivity 2 For Review

Populate Pump run schedule based on telemetry data in WS Pro

As a planning modeler calibrating within WS Pro, I want to use the "Load from Live Data" tool on pumps in Plan mode to populate the Control Data timeseries profile based on a data stream of 1's and 0's indicating on/off. While this is already avai...
Guest over 4 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists