Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 29 of 1370

Conduit Numbering

I have encountered a glitch with the conduit numbering system. While manhole numbering works as expected (check the snip), the conduit numbering is generating inconsistent formats as expected such as CO-1.001, CO.1002, and so on Our expectation is...
Jana Anbu 8 months ago in InfoDrainage / Productivity 2 Already exists

Basin / Swale inlets pick up IL at point of entry, not the bed level

Inlets automatically pick up down stream bed level of SWC. Inlet pipes have to be locked, with the IL's calculated manually which can be difficult to get right along a basin or swale that is long and winding. Would it be possible for the IL pipe t...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 2 years ago in InfoDrainage / Productivity 2 Already exists

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Excel export of pipe results

when outputting drainage schedules ( the default used in InfoDrainage is no good as lots of information cannot be selected) there was a simple and effective way of exporting the relevant info ( pipe number/diameter/gradient/us il/ds il/ cover leve...
Steven Gilchrist over 2 years ago in InfoDrainage / Productivity 1 Already exists

When drawing infiltration trench, let me hold shift to invert which side of the trench i draw first

When drawing the trench, it is usally easier to draw the side along which im working against (IE a footpath edge) first, and then the width. Othewise i then have to rotate the object. Allow a user input by holding shift while drawing to allow user...
Guest over 2 years ago in InfoDrainage / Productivity 1 Already exists

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Operations 2 Will not implement

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration

A simple way to get an upstream or downstream trace analysis for all objects (node or pipe)

In WS Pro Upstream/downstream tracing is easy for a single object. Obtaining a single useful value (i.e. property count) is easy for multiple objects. Combining the two is very difficult at the moment in WS Pro I want to be able to obtain, eithe...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support