Skip to Main Content
Autodesk
Status Under consideration
Categories Operations
Created by Caroline Heylen
Created on Jan 21, 2022

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simulation.
  • Attach files
  • Admin
    Nathan Gerdts
    May 26, 2023

    Thank you for sharing your feedback. With GMR Config, you can include time varying profiles like Pipe Status or Pump Station Live Control to close links for a select period of time during each separate analysis.
    Have you tried this?