Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 258 of 1372

dendric numbering and table of results

its frustrating when interrogating and amending the pipe network, when the pipes and chambers are not in the same order, the way it was presented in MicroDrainage gave a clear path with the final outfall pipe being at the bottom, not randomly plac...
Steven Gilchrist over 2 years ago in InfoDrainage / Reporting 1 Under consideration

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom about 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Flow Path (Profile Plots)

Would love a plot setting to show which design storm is being run as it relates to the max. water level
Jess Ewing over 1 year ago in InfoDrainage / Reporting 2 Gathering support

Insert contours at regular intervals instead of "double pegs"

Currently, contours can be added at irregular intervals by using the "double pegs" function in InfoDrainage. In reality, contours are always placed at regular intervals, such as a major contour at every 10 ft or 5 ft of elevation. The option to ad...
Daniel'le DeVoss over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Lock pipe diameters only.

After simulation and there is flooding, trying to upsize the pipes, if the wizard is run again it reverts to the previous diameter, i dont want to lock (ALL) as i still want to use the wizard to lower the inverts etc, downstream.
Steven Gilchrist over 1 year ago in InfoDrainage / Hydraulics 3 Gathering support

Allow changing displayed simple junction size

In plan view we are able to change the sizes of icons, labels, proper manholes and many other parts of our pipe networks, but the symbology for simple junctions is fixed in size (at about 1.2m?) and cannot be changed, which makes modelling, for ex...
Guest 11 months ago in InfoDrainage / Productivity 0 For Review

Adding Sediment Basin Design Function

It would be helpful if we can design sediment basins in infodrainage as another stormwater control and phase
Jenna Woyner almost 2 years ago in InfoDrainage / Other 2 Will not implement

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc

Export PDF of Quick Storage Estimate, QBAR calcs, volume calcs etc
Guest about 2 years ago in InfoDrainage / Reporting 3 Gathering support

Using SWMM5 treatment equations at a node or link in ICM Networks

Users would like to use SWMM5 Buildup Washoff in ICM Networks AND the SWMM5 treatment equations at a node or link in the ICM St Venant solution. ICM SWMM networks have both options but for the purposes of using the powerful routing solution in I...
ROBERT DICKENSON over 4 years ago in InfoWorks ICM / Treatment / Water Quality 2 Gathering support

Hybrid gravel and crate soakaway option

We would like a Stormwater control (soakaway) feature that allows for a narrow gravel trench below a crate layer within the same soakaway, we have tried modelling as two separate features but the interaction between the two systems isn't accurate ...
Mark Jennings 6 months ago in InfoDrainage / Hydraulics 0 For Review