Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 137 of 1370

Post processing scripts as part of a live simulation

We need to be able to automatically run scripts at the completion of our forecasts. it would be extremely helpful if we could have these scripts as part of the manifest workflow so that they started as soon as the results export task completed.
Richard Body almost 6 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support

Possibility to get the results from all timesteps for every section of a river reach by Ruby scripting

Now there are only two options: get the results for all timesteps for the first section of the reach (results-method), or get the results at all sections, but only for the current timestep (result-method). I would like to be able to query the resu...
Michael Huybrighs about 2 years ago in InfoWorks ICM / Results 0 Gathering support

Statistical Analysis of ARR Temporal Pattern Ensembles should be enabled

Infoworks ICM should aim to facilitate statistical analysis of temporal pattern ensembles of ARR with a single click. Easily accessing and reviewing the statistical parameters for the required temporal pattern ensembles will allow Australian users...
Guest over 1 year ago in InfoWorks ICM / Results 0 Gathering support

Use TSDB data streams in flexible graphs

Currently, I can graph individual TSDB streams, or once a simulation has run compare a TSDB stream with modelled data at a particular node. But it would be helpful if I could compare TSDB streams with other TSDB streams, or with multiple model loc...
Iain Scott almost 6 years ago in InfoWorks ICM / Results 0 Gathering support

Remove "Delete simulation" option from "Results Manager"

Within the "Results Manager" window, "Delete time-varying results files" and "Delete all results files" are very useful tools - with this being the go-to method within my team for removing no-longer-needed results files. However, I have never seen...
Jason Kulsdom over 2 years ago in InfoWorks ICM / Simulations 3 Gathering support

Update Storage array from ground model

Provide the ability to update a storage array (curve) from ground model without destroying manually entered data
Guest about 6 years ago in InfoWorks ICM / Hydraulics / Productivity / Results 0 Gathering support

A Mesh Layer export function to facilitate the analysis and visualization of temporal mesh element results in QGIS.

I would like to see a Mesh Layer export function that would facilitate the analysis and visualization of temporal mesh element results in QGIS. Use case example: https://qgis.org/en/site/forusers/visualchangelog312/index.html#feature-vector-trace...
Guest over 5 years ago in InfoWorks ICM / Export Data / GIS Layers / Results 0 Gathering support

Generate Stats reports as a background task

Generate Stats reports as a background task so User Interface isn't locked - as for simutations and meshing
Robert Woodall almost 4 years ago in InfoWorks ICM / Performance / Results 0 Gathering support

Built-in mapping capabilities, like PCSWMM and Civil 3D have

Other software has built-in background mapping capabilities for free, using OpenStreetMaps or Bing satellite/hybrid road maps for georeferenced models. The current capability of supporting WMS servers falls way too short and there are no free opti...
Dave White about 3 years ago in InfoWorks ICM / GIS Layers / Productivity / Visualization 0 Gathering support

leave Layers and Themes window open

Could you make it possible to work in the Geoplan without having to close the Layers and Themes window? It would make switching Layers on and off much easier. Alternatively you could add a separate window to switch layers on and off.
Richard de Koning almost 6 years ago in InfoWorks ICM / Productivity / Visualization 1 Gathering support