Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 36 of 1442

Show data errors

Mike + added a function called "show data errors" in its new product in 2021, which can display objects that lack necessary field information and generate a table. This function can improve the ability of model engineers to deal with model errors ...
Liu Qiusheng about 5 years ago in InfoWorks ICM / Validation 1 Gathering support

Optional channel to river reachs option

The way ICM identifies the centre-line of the river reach is by using the point with the lowest invert level. Regardless of the shape of the channels of how much is the value of the X coordinate, didn't affect the appearance of the section to gene...
Liu Qiusheng almost 6 years ago in InfoWorks ICM / Network / River Modeling 0 Gathering support

Intelligently select nodes in river reaches

When clicking on a node over a subcatchment, the software can recognise the user is after the node. When the same is done for a node on a river reach, the node is not automatically selected but rather the choice is presented to the user.
Guest about 6 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Varying conduit/culvert shape along its length

When modelling irregular culverts, the shape of culvert usually varies along its length as well. EX: Culvert having 900mm dia at inlet, varies along its length and at outlet has 500mm. Can this be included in the options for transition of shape al...
Guest about 2 years ago in InfoWorks ICM / River Modeling 1 Gathering support

Alert on river sections without having to make 1D results points

We'd like to create alerts on river sections without having to create either results points or having the reach split at the cross section in question
Richard Body over 6 years ago in InfoWorks ICM / Live Modeling / River Modeling 0 Gathering support

Water environmental capacity calculation

Add environmental capacity calculation in ICM, user can easily find how much pollution the river can receive at each time step and each river’s total environment capacity during the whole simulatiton. Water Environmental Capacity Calculation Backg...
Liu Qiusheng over 6 years ago in InfoWorks ICM / River Modeling / Water Quality 0 Gathering support