Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 36 of 1442

Add validation for errors causing simulation to fail

If a conduit has a cross section with zero width, the simulation will fail with the following message: "Fatal 37: INTEGRITY FAILURE: geo_setup - invalid conveyance for ABC474.1, section 1". The validation does not catch this error. It would be hel...
Corina Overman about 1 month ago in InfoWorks ICM / Validation 1 For Review

Create channel section lines from points

Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
Guest about 3 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Remove Need to Validate When Changing Background Layers

Suggest that a network not need to validated or show that it was edited (red circle) for only switching on/off a background (e.g., aerial)layer would be appreciated. Keeping scenarios straight is tough enough w/out the additional heart attack when...
Guest over 4 years ago in InfoWorks ICM / Productivity / Validation 3 Will not implement

Validation as a background task

Validation as a background task so UI isn't locked.
Guest over 6 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest about 3 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 12 months ago in InfoWorks ICM / Validation 0 For Review

Add an option to 'apply rainfall' directly to river reach objects

Currently a user would need to define a subcatchment to generate runoff for a river reach. This is okay for 1D models but for 1D/2D models, especially 2d runoff models it adds some additional steps for the user. It would be nice for add a 'apply r...
Alex Grist 11 months ago in InfoWorks ICM / River Modeling 2 Under consideration

Enable Data Flags for bed levels and roughness values in river section data

Enable data flagging for the bed level and roughness values within the river cross section data. This information was available in RS and is sorely missed.
Guest about 6 years ago in InfoWorks ICM / Flags / River Modeling 0 Gathering support

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest over 5 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support