Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 101 of 1442

Ability to change mesh ground level values without remeshing

Mesh zones and Mesh level zones are available to change ground level values for the contained 2D meshes, but it will require re-meshing. If we can select 2D meshes by the polygon selection or selection tool and change the mesh elevation values wit...
Miyuki Okuda over 1 year ago in InfoWorks ICM / Mesh 1 Already exists

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 11 months ago in InfoWorks ICM / Results 3 Gathering support

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest over 4 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest about 3 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake almost 6 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest about 3 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Extra Results Outputs for some features in ICM

Hi there - Doing some work for a client I found the following limitations in results exports from Infoworks ICM: 2D Base Linear Structure: ls_underflow and ls_overflow results variables cannot have a summary of peak value exported by CSV or SHP. T...
Guest 11 months ago in InfoWorks ICM / Results 0 For Review

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker almost 2 years ago in InfoWorks ICM / Results 2 Already exists

Allow for the running of statistics templates and generation of grid reports such as RPA and worst case using ICM Exchange

No description provided
Guest almost 6 years ago in InfoWorks ICM / API / Exchange / Productivity / Results 0 Gathering support