Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 142 of 1370

Statistic Report Enhancement

Provide a way to enhance the statistical report to allow specific criteria above a threshold.
Guest about 6 years ago in InfoWorks ICM / Reporting / Statistics 0 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Can the simulation log file be broken up into sections

Can the simulation log file be broken up into sections, as models get bigger and many with several 2d zone trying to find what is actual causing a simulations failure is becoming a bit more difficult having to scroll through big log files for that...
Bob Fleming almost 5 years ago in InfoWorks ICM / Errors / Reporting 0 Gathering support

Report InfoSWMM available capacity against theoretical flow for specified d/D

InfoSWMM provides Pipe/Conduit summary report with values for Max flow divided by "Full Flow". Here the "full flow" is based on Manning's equation for when the pipe is full. However as a sewer utility, we're not allowed to fill pipes. We must keep...
Guest about 5 years ago in InfoWorks ICM / Grids / Reporting 2 Gathering support

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest about 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi almost 2 years ago in InfoWorks WS Pro / Other 0 For Review

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Refine selection to include subcatchments draining to multiple links or other subcatchments

Subcatchments draining to a single link can already be added to an existing selection of node and links by using the refine option, if the upstream node of that link is selected. It would be interesting to have a similar extension for subcatchment...
Guest over 5 years ago in InfoWorks ICM / Hydrology / Reporting 0 Gathering support

Enable re-runs for selected scenarios

With the new Reserved Run workflow I can re-run simulations with my latest changes quickly without needing to commit. However if I'm using scenarios in the run, WS Pro re-runs all scenarios every time, even if there weren't any changes. I want an ...
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support