Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Productivity

Showing 138 of 1423

Use ruby to edit rainfall dialogue box

Exporting rainfall files to csv for manipulation creates details of the storm events themselves, we would like to be able to change the return periods, durations, multiplying factors shown in the rainfall dialogue editor instead.
Guest about 6 years ago in InfoWorks ICM / API / Exchange / Productivity / Rainfall 0 Gathering support

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 11 months ago in InfoWorks ICM / Validation 0 For Review

Adjust mesh locally without remeshing all

Adjust mesh locally without having to remesh the entire 2D zone.
Guest over 6 years ago in InfoWorks ICM / 2D Flooding / Productivity 2 Will not implement

Integrate a Template option for setting out run group in Infoworks ICM

I am working on project which includes 50 models. where we have to give runs for different return periods and durations for each model. It is a time taking process, which unnecessarily create chances of error by creating run setup every time. is i...
Mohit Gupta almost 6 years ago in InfoWorks ICM / Productivity 0 Gathering support

Allow for the running of statistics templates and generation of grid reports such as RPA and worst case using ICM Exchange

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity / Results 0 Gathering support

Possibility to turn off report windows

Now, when updating elements from ground model, extending cross sections, inserting an opening in a bridge… a report is displayed. This can be very annoying when building up a model and you have to click the report windows away. It would be useful ...
Guest almost 3 years ago in InfoWorks ICM / Mesh / Productivity 2 Gathering support

reduce validation time of models with infiltration zones

When using rainfall onto mesh in InfoWorks ICM, we often rely on infiltration zones to represent different land uses and their runoff characteristics (e.g., impermeable surfaces, grass, etc.). To ensure full coverage and avoid gaps or "donuts" in ...
Coen Maas 7 months ago in InfoWorks ICM / Validation 2 For Review

Enable Data Flags for bed levels and roughness values in river section data

Enable data flagging for the bed level and roughness values within the river cross section data. This information was available in RS and is sorely missed.
Guest about 6 years ago in InfoWorks ICM / Flags / River Modeling 0 Gathering support

Add support to the GIS Layer Control to access the new OS Open Data API's WMTS

Enhance/Add support to the GIS Layer Control to access the new OS Open Data API's WMTS. It appears at the minute you can only add WMS layers. https://osdatahub.os.uk/
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Data Exchange / GIS Layers / Import data 1 Gathering support

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest over 5 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support