Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 80

ICM sims updated with better control on sims outcome

I think waiting a big time for a sim to be done and then because the sim results disk gets full, loosing all of the simulated data is something that should be prevented from the time someone sends the simulation. A warning should be issued when yo...
Ionut Pintea over 5 years ago in InfoWorks ICM / Simulations 0 Gathering support

Application of design storms in ICMLive

We'd like to be able to predefine some design storms in ICMLive (note that this is NOT the same as design rainfall in ICM). The idea is that we'd have these storms that could be optionally applied by operators to see the likely effect of a rainfal...
Richard Body over 5 years ago in InfoWorks ICM / Live Modeling / Rainfall 0 Gathering support

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body over 5 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support

ICM - Statistics Template: Daily events

I want to be able to break my events into daily values. Currently this would require setting up 7 separate templates each with the unique day set under the 'Time Window' button. I want a tick option added that will allow me to do this within the s...
Guest over 4 years ago in InfoWorks ICM / Reporting / Results 1 Gathering support

"Schedule Job(s)" request for extra functionality

At present, when two users each send a large batch of simulations to run on a remote PC via the coordinator, the coordinator is not very smart about allocating out resource to the simulations. For an extreme example, let’s say there is a remote...
Jason Kulsdom over 2 years ago in InfoWorks ICM / Simulations 0 Gathering support

Alert Action Repetition Control - repeat action after alert has been active for Xnr runs

We have a model set up to process the EA's flood alerts and send out warnings when new ones become active. The model runs every 30 minutes, so we pick up the latest alerts and the repetition control is set to once so people don't become drowned in...
Geoffrey Brown about 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

I want Infoworks' "Export maxima to GIS" to include the below parameters to assist scour protection design within 2D Zone

1. For shear-stress-based design 1.1 Max Shear Stress (in N/m2 with at least 1 digit after the decimal point) 1.2 Hydraulic Slope at Max Shear Stress (in percent with at least 3 digits after the decimal point) 2. For velocity-based design 2.1. Max...
Phuong Mai almost 4 years ago in InfoWorks ICM / Export Data / GIS Layers / Simulations 1 Gathering support

Wet Well Graph

As a modeler, I would like to see a plot showing everything for a pump station in one place. See the attached figure. Inflow/outflow and the flows from each pump. The 3D chart helps a lot showing which line is which.
Guest almost 4 years ago in InfoWorks ICM / Results 0 Gathering support

Detention Time Modelling

We would like the model to calculate detention time of sewer in a simulation. The idea is similar to water age calculation in WS. The aim is to use this as a proxy for odour study, in essence we would like to be able to create thematic maps to sho...
Guest over 5 years ago in InfoWorks ICM / Reporting / Results / Wastewater 0 Gathering support

Schedule Jobs - remove Any computer

Ability to remove 'Any Computer' option from Schedule jobs window.
Guest about 4 years ago in InfoWorks ICM / Productivity / Simulations 1 Gathering support