Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 266 of 1370

Ruby Storage Area fix

When trying to check if a storage area contains a node, Ruby shows the error message that the storage area object is not a polygon, although the methods show that a storage area has a method 'contains'. The workaround is now to create a temporary ...
Marcel Glasbergen over 1 year ago in InfoWorks ICM / Ponds/Storage 1 Under consideration

Spread automatic inserted vertices in Bank Lines equally

The "Update from ground model" provides the option to “Insert vertices on lines to give maximum spacing of x m”. This is very useful for creating Bank Line vertices at small intervals. It would be helpful if those inserted vertices are spread equa...
Guest about 3 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Ability to apply blockage percent

Applying pipe blockage is a standard required in Australia and the functionality in ICM to do this is not user friendly (using blockage links). A simple % pipe blockage in the conduit properties should really be an option. This is particular the c...
Guest over 4 years ago in InfoWorks ICM / Hydraulics 3 Gathering support

Baseline Replacement Cost Tool

IAP has a very simple baseline replacement cost tool. It has been requested to be in Info360 Asset. Could be rolled into the deterioration modeling tool. https://help.innovyze.com/space/infoassetplanner/15794424/Baseline+Replacement+Cost
Tim Medearis about 2 years ago in Info360 Asset / Rehabilitation Planning 1 Gathering support

River bank cumulative flow

It would be great to have the ability to graph bank flows and have a cumulative flow result available.
Guest almost 6 years ago in InfoWorks ICM / River Modeling 1 Gathering support

Merge pond and storage nodes and increase their functionality

Pond nodes: - allow variable infiltration at different levels (up to 3 different rates) - allow variable perimeter with level i.e. plan area through which side infiltration can occurs can vary - no porosity function Storage nodes: - 1 porosity va...
Lizzie about 4 years ago in InfoWorks ICM / Hydraulics / SUDS 1 Gathering support

Workflow that allows field inspectors to view CCTV recommendations directly in Info360 Asset and complete the CCTV directly in the product

After discussing with Martin and Martin about migrating workflows that are still occurring in Info360 Asset. After a Rehab Decision tree recommends that a pipe needs CCTV it would be useful to allow the field inspector to view the Rehab report wit...
Guest almost 3 years ago in Info360 Asset / Inspection & Media Management Workflows / User access / roles / permissions 3 Gathering support

Integration with Industry Cost Data (E.g. RSMeans) for Rehab Costs & Updates

Integrate with industry cost data source like RSMeans. User can link their rehab actions to labor, equipment, material costs which will automatically be keep updated by region.
Mike Maylone about 1 year ago in Info360 Asset 0 Gathering support

Change pipe material based on inspections

Many utilities confirm or update pipe materials in their GIS data based on inspections; this is a feature that is possible within IAP. This was accomplished by comparing GIS materials to the imported inspection materials within the Validation tool...
Kim Solberg over 1 year ago in Info360 Asset / Data Editing 1 On roadmap

Time varying roughness values for rivers

As vegetation changes throughout the seasons, it would be great if we could also have time varying roughness patterns for river reaches.
Guest almost 6 years ago in InfoWorks ICM / Hydraulics / River Modeling 0 Gathering support