Skip to Main Content
Autodesk
ADD A NEW IDEA

Hydraulics

Showing 92

Multiple river section results

It would be great if multiple river sections could be selected and if it was then possible to produce multiple object graphs from these and by extension do exports.
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

snap river reach lines to cross sections

When creating river reach links the vertices should snap to cross sections so that vertices are only created on the cross-section lines (if vertices are to close on river reach objects you get meshing problems later on!) and is easier to follow th...
Guest over 1 year ago in InfoWorks ICM / River Modeling 0 Gathering support

Drain nodes connected to 2d domain representing road gullies to 1D pipe network without digitised connection

Often datasets of road gullies are only in point format and lack details on the connections to the surface water sewer network. A function to allow 1D nodes representing road gullies (which are are connected to the 2D domain with a head discharge ...
Guest about 1 year ago in InfoWorks ICM / Inlets 0 Gathering support

Pipe collision check

Client feedback: an automatic check for colliding pipes would be highly appreciated to avoid nightmares in the construction.
Guest about 5 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Update Storage array from ground model

Provide the ability to update a storage array (curve) from ground model without destroying manually entered data
Guest over 5 years ago in InfoWorks ICM / Hydraulics / Productivity / Results 0 Gathering support

Bridge section data updates

When a bridge section is changed then there are repeatable tasks for entering openings again, if this workflow could be improved that would be great.
Guest over 5 years ago in InfoWorks ICM / Bridge / Hydraulics 0 Gathering support

Allow all objects (nodes, subcatchments etc) to be included within the ‘gauge’ objects used in the run window

In a simulation run window the user has the choice to use a selection list of 'gauged' objects. This is useful so as to provide the results of some objects more frequently, or to only save the results from some objects and not others, in order to ...
Lizzie over 3 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

RTC updated to support scripting

It would be good to have RTCs available through direct scripting rather than through the RTC editor alone.
Ann Pugh over 5 years ago in InfoWorks ICM / API / Exchange / RTC 1 Gathering support

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest about 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Show water levels at Bridge Linear Structures

We would like to see the water levels at the bridge linear structures as it is important for us to be able to see the water levels with respect to the bridge openings and decks.
Richard Body over 4 years ago in InfoWorks ICM / Bridge / Hydraulics / Results 0 Gathering support