Skip to Main Content
Autodesk
ADD A NEW IDEA

Hydraulics

Showing 95

Drain to 2D line source from subcatchment

The current function allows rainfall runoff to be given to a node, link, multiple links and 2D point source, but not to 2D line source. We are modelling rivers with 2D meshes, but thinking to represent rainfall runoff with subcatchments, as it is ...
Miyuki Okuda over 3 years ago in InfoWorks ICM / 2D Flooding / Hydraulics 0 Gathering support

Rating curves / equations as downstream boundaries

At the moment we can use 'user control' links to act upstream of the DS boundary. These links have head/flow/power as their inputs. It would be useful to have a dedicated object that could be either a look up table of levels (rather than heads) an...
Richard Body over 5 years ago in InfoWorks ICM / Events / Hydraulics 0 Gathering support

Sim Slots

There should be an option to select to limit sim slots to be used by a model so other models dont go in waiting when running sims simulataneously .
Guest over 4 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Multiple river section results

It would be great if multiple river sections could be selected and if it was then possible to produce multiple object graphs from these and by extension do exports.
Guest about 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Pipe collision check

Client feedback: an automatic check for colliding pipes would be highly appreciated to avoid nightmares in the construction.
Guest almost 5 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Update Storage array from ground model

Provide the ability to update a storage array (curve) from ground model without destroying manually entered data
Guest over 5 years ago in InfoWorks ICM / Hydraulics / Productivity / Results 0 Gathering support

Bridge section data updates

When a bridge section is changed then there are repeatable tasks for entering openings again, if this workflow could be improved that would be great.
Guest about 5 years ago in InfoWorks ICM / Bridge / Hydraulics 0 Gathering support

Allow all objects (nodes, subcatchments etc) to be included within the ‘gauge’ objects used in the run window

In a simulation run window the user has the choice to use a selection list of 'gauged' objects. This is useful so as to provide the results of some objects more frequently, or to only save the results from some objects and not others, in order to ...
Lizzie over 3 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Show water levels at Bridge Linear Structures

We would like to see the water levels at the bridge linear structures as it is important for us to be able to see the water levels with respect to the bridge openings and decks.
Richard Body about 4 years ago in InfoWorks ICM / Bridge / Hydraulics / Results 0 Gathering support

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest almost 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support