Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 220 of 1372

Bridge section data updates

When a bridge section is changed then there are repeatable tasks for entering openings again, if this workflow could be improved that would be great.
Guest almost 6 years ago in InfoWorks ICM / Bridge / Hydraulics 0 Gathering support

2D Result Long Profile results comparison

When doing flood study, XPSWMM had a cross-section tool that would show WSEL. While I can use US/DS profiles to compare two scenarions - I want to cut a long section along a 2D channel (and no I am not converting it to River Sections as it defeats...
Guest over 1 year ago in InfoWorks ICM / 2D Flooding 1 Gathering support

Provide option to allow for several multipliers and use with selection sets

In addition to a global multiplier, sometimes you want to peak certain areas and selection sets with specific peaking factors. WaterCAD allows for this under their calculation options.
Michele Marston over 1 year ago in InfoWater Pro / Operational Modeling 0 Gathering support

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Allow all objects (nodes, subcatchments etc) to be included within the ‘gauge’ objects used in the run window

In a simulation run window the user has the choice to use a selection list of 'gauged' objects. This is useful so as to provide the results of some objects more frequently, or to only save the results from some objects and not others, in order to ...
Lizzie about 4 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

modeling surge check valves

I’m also wondering if you all are considering adding more options on how to model check valves.
Guest about 2 years ago in InfoWater Pro / Engine 1 Gathering support

Closed surge tank initial water level

would be nice for the surge program, is to have the initial water level automatically calculated for closed surge tanks
Guest about 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Show water levels at Bridge Linear Structures

We would like to see the water levels at the bridge linear structures as it is important for us to be able to see the water levels with respect to the bridge openings and decks.
Richard Body almost 5 years ago in InfoWorks ICM / Bridge / Hydraulics / Results 0 Gathering support

Validation of Bridge data

When a model is validated, it doesn't pick up on problems with bridges, that prevent the model from running. For example, the error "bed section is above soffit" is given when trying to run the model, but does not appear in the validation messages...
Guest about 5 years ago in InfoWorks ICM / Bridge / River Modeling / Validation 0 Gathering support

snap river reach lines to cross sections

When creating river reach links the vertices should snap to cross sections so that vertices are only created on the cross-section lines (if vertices are to close on river reach objects you get meshing problems later on!) and is easier to follow th...
Guest about 2 years ago in InfoWorks ICM / River Modeling 0 Gathering support