Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Improvement on the Numerical Correction Process in ICM

The current procedure for ‘Numerical Correction’ in ICM requires users to remove any existing values to calculate the correction (for Preismann and Base flow) before the inbuilt routine is run. If this wasn't made the calculated correction values ...
Guest about 6 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Sort by Validation Error in Grid View

Allow columns in grid views to be sorted by validation error(s). This would make fixing validation errors much easier. For example, when modelled pipes/nodes are updated from the GIS, the Subcatchments sometimes lose their Node ID link as the nod...
Bradley Nissley over 6 years ago in InfoWorks ICM / Grids / Validation 0 Gathering support

Select Assets with a given User Flag in any Properties Field

Allow assets to be selected/sorted (SQL or Grid View) based on a flag value in any properties field. This would make some model build and QA tasks much easier. For example, data may be needed to properly model a serwerage pumping station but isn'...
Bradley Nissley over 6 years ago in InfoWorks ICM / Flags / Productivity 1 Gathering support

Graph sum of multiple objects instead of each selected object

While looking at multiple drainage areas in a basin (in my example), results can become hard to read; it would be nice if you could graph multiple objects and have the option to see the summation of the selection instead of each individual item.
Andrew (AJ) Czubai about 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Modelling of Septicity

As a sewer modeller I have occasionally been asked about odour generation in sewer networks. I have noticed that DO (dissolved oxygen) and BOD (biochemical oxygen demand) are both inputs in the wastewater and trade-waste model groups of Infoworks ...
Guest over 6 years ago in InfoWorks ICM / Results / Simulations / Water Quality 0 Gathering support

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest almost 5 years ago in Other Product Ideas / Asset Management 1 For Review

I want to be able to open a layer list using Exchange (Ruby)

As part of a ruby script, I would like to add a specific layer list to a network to enable a Spatial SQL to be run. This script needs to be run on all our networks as part of a regular update. We have 1100 models which would require an extensive m...
Jose Pereira almost 5 years ago in InfoWorks ICM / API / Exchange 0 Gathering support

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood over 6 years ago in Other Product Ideas / Asset Management 0 For Review

Different symbology for different defect types

In the initial release all observations are in a single layer. If we can break these out into continuous observations/defects, point defects, and connections that would be great. Specifically connections as stub outs are very impactful to customer...
Tim Medearis almost 5 years ago in Info360 Asset / Customization / Styling 0 Gathering support

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest over 6 years ago in Other Product Ideas / Asset Management 1 For Review