Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Create Ruby script syntax from ODIC/ODIC interface

The idea is to have a method available on InfoWorks ICM, InfoWorks WS Pro and InfoAsset Manager ODIC/ODEC interface that will create the equivalent Ruby syntax comprising all of the required parameters for the ODIC/ODEC methods. The Ruby script co...
Tony Andrews about 2 years ago in InfoWorks ICM / API / Exchange / Data Exchange 1 Gathering support

Transportabele database (.icmt) containing an earlier version of the commited network without losing the commit history

For the moment we can only 'branch' an earlier version from the commit history interface or 'copy' this earlier version. - the branch can't be disconnected from the 'mother' network - the copy looses the commit history It would be nice to deliver ...
Pieter Snoeck over 4 years ago in InfoWorks ICM / Data Exchange / Export Data / Transportables 0 Gathering support

i am looking to bring google map in background

No description provided
Guest over 4 years ago in InfoWorks ICM / GIS Layers / Productivity 2 Gathering support

Easier to interrogate log results file

In the review of a model we use the log results to identify whether the model has particular problems and review the overall mass balance. The log results are in text format and it is fairly annoying scrolling through the find the items needed. Co...
Guest over 2 years ago in InfoWorks ICM / Reporting 1 Gathering support

RTC Debugging Interface and Support

It would be really useful to have a debugging module for the RTC components in InfoWorks ICM so that one can go step by step through a simulation to display in simulation RTC values-things like variable values (e.g. timers), range/logic values, ac...
Guest over 4 years ago in InfoWorks ICM / API / Exchange / RTC 1 Gathering support

As an organization, we would like the ability to choose an alternative final risk calculation method.

So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model. It would great if the user could choose the ...
Guest about 6 years ago in Other Product Ideas / Asset Management 5 Gathering support

Update French rainfall to include multiple durations

Ability to add more than 1 duration per return period in a single rainfall object. There are 3 sets of parameters for durations 6 < t < 60, 60 < t < 360 and 360 < t < 24hr. It would be useful to be able to add these parameter...
Guest about 3 years ago in InfoWorks ICM / Rainfall 1 Gathering support

Sediment depth variable for Storage nodes

It appears that amounts of sediment are carried along when water is overflowing over the banks of the river: part of the sediment from sediment fractions SF1 and SF2 leaves the river and goes to the Storage Areas during flooding. Although this is ...
Edith Maroy about 3 years ago in InfoWorks ICM / Sediment / Simulations 0 Gathering support

Order ARR19 Box and Whisker plots by duration

The box and whisker plot outputs order alphabetically. It would be useful if it ordered based on rainfall event duration instead.
Guest about 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Optimizing Asset Management with Classes in Info360 Plant

Currently, in Info360 Plant, when creating a common analytic or workspace for the same type of asset (e.g., a pump or a set of pumps), it is necessary to manually create the analytic or workspace for each asset. This process is facilitated through...
Javier Coronado about 1 year ago in Info360 Insight / General 0 For Review