Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

manhole and pipe size files

when I start a new network, the criteria automatically selects my default manhole and pipe size file, can you change it so when importing a file for the first time it selects my standard default files, older versions did select the default file
Guest over 3 years ago in InfoDrainage 1 Gathering support

Weather Services

A service that allows me to view weather data and forecasts in workspaces and treat the associated data as sensor data to use in analytics
Guest almost 3 years ago in Info360 Insight / General 0 Under consideration

Change upstream pipe connections

The ability to reassign the upstream component of a connection would be so useful. You can bulk import stormwater features and connections from AutoCAD but InfoDrainage does not seem to recognise when the connection is from the stormwater feature ...
Chloe Spencer over 1 year ago in InfoDrainage / Other 0 For Review

Display multiple networks in 3D.

In order to aid the layout design of drainage networks, it would be useful to see both foul and surface water sewer networks simultaneously, in the 3D view. This would allow designers to see the clearance between pipes and chambers and have piece ...
Guest about 2 years ago in InfoDrainage / Visualization 3 Already exists

Better hydraulic representation of flow in permeable paving

Flow through permeable paving does not occur as one would expect. Is greatly affected by the shape and direction the paving is drawn in InfoDrainage. When drawing an irregular shape the hydraulic grade lines appear incorrect, with flow all at one ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest over 1 year ago in InfoDrainage / Productivity 1 Gathering support

Hybrid gravel and crate soakaway option

We would like a Stormwater control (soakaway) feature that allows for a narrow gravel trench below a crate layer within the same soakaway, we have tried modelling as two separate features but the interaction between the two systems isn't accurate ...
Mark Jennings 9 months ago in InfoDrainage / Hydraulics 0 For Review

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Outfall Elevation Curve Time Series

Please add the ability to input decimal places for the Time in the Outfall Elevation Curves. Currently InfoDrainage only accepts whole numbers.
Guest 9 months ago in InfoDrainage / Hydraulics 0 For Review