Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 749

Japanese Standard Rainfall Intensity Formulas

In Japan, four rainfall intensity formulas (Talbot, Kuno-Ishiguro, Cleveland, Sherman) are used in sewerage planning, including stormwater drainage. According to a survey report by the Ministry of Land, Infrastructure, Transport, and Tourism, thes...
MASASHI KAWAMURA 2 months ago in InfoDrainage / Rainfall 0 Gathering support

Demand Area Analysis: Factoring Multiple Categories

Currently, Demand Area Analysis only allows demand adjustment to one Leakage and one Unmetered category at a time.It would be very useful to be able to factor additional demand categories such as:Average CustomersMetered DomesticCommercial (e.g. 1...
elizabeth Richardson about 1 month ago in InfoWorks WS Pro / Other 3 Gathering support

Go to a node or link from a graph

It would be useful if you could simply Right-Click a graph and there be an option to "Go to node/link" to quickly go to it in the geoplan.
William Tracey about 1 month ago in InfoWorks WS Pro / Other 0 Gathering support

Add Manhole 'clocks' to the manhole schedule

It would be useful to show a basic plan view of the manholes in the manhole schedules (with inlets and outlet alignments accurately shown). This is useful when contractors order per-cast manhole bases that require 'clock' diagrams.It would be real...
Ian George 17 days ago in InfoDrainage / Other 0 Gathering support

InfoAsset Online - Grid Sorting

When a selection of schedulable objects is made they are not ordered. They should be ordered preferably by the date completeled, with the latest survey at the very top of the grid.
Idris Nujjoo 8 months ago in Info360 Asset / General 3 Gathering support

Drag Labels in InfoDrainage Plan View

Text labels often end up overlapping and are illegible. It would be nice to be able to drag them like you can in CAD / Civil3D.
Midori Patterson almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Allow buildings to connect to multiple nodes with specified roof area percentages

In existing urban areas, especially during road reconstruction projects, we often face situations where only part of a roof can be disconnected from the foul system. Currently, in InfoWorks ICM, a building object can only be linked to a single nod...
Coen Maas 3 months ago in InfoWorks ICM / Hydraulics 1 Gathering support

Incorporate the NZ Pipelines Inspection Manual 4th Edition into Info360 Asset

We currently use InfoAsset to record our CCTV inspections and we rely on the NZ Pipelines Inspection Manual 4th edition for the scoring. We are interested in migrating across to Info360 Asset but until this has been incorporated into the product w...
Guest 8 months ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

Enable Import of CCTV data via db3 file type

The native file type of Wincan typically generates a .db3 database file type. Would be good if Info360 Asset was able to directly import from that file type rather than requiring conversion to .xml
daan van riel 16 days ago in Info360 Asset / Import / Upload 0 Gathering support

Ability to conduct batch edits in CCTV inspection page

Currently, the user can make manual updates to CCTV inspections. However, in many cases they will want to edit inspections in batch. One common example is the Us/DS manholes do not match for hundreds (even thousands) of inspections. Rather than de...
Martha Nunez about 1 year ago in Info360 Asset / Data Editing / Inspection & Media Management Workflows 0 Gathering support