Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks WS Pro

Showing 7

Ruby SQL access to observed vs Predicted outputs

We are generating a number of scoring tools and understanding calibration levels and results are a part of that (generally looking at things like the RMS etc.) At the moment we need to pull everything out of WS Pro to a spreadsheet as we cannot ac...
Duncan Allen 23 days ago in InfoWorks WS Pro / Automation 1 Under consideration

Scenarios should stop tracking differences when values return to default

Our organisation is using scenarios to manage alternate model configurations like Peak Day, Average Day, etc. in our main working model. Over time some field values will change from the Base value, and then change back (or the other way around, wh...
Dave Watts 3 months ago in InfoWorks WS Pro / Other 1 Under consideration

Additional Custom Fields available when needed

Our company uses all available user fields and needs additional room for sharing important metrics derived from hydraulic analyses. We want an option to toggle on additional fields to store this information alongside pipes for Themes and references.
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Other 1 Under consideration

IWLive - alernative warning themes for polygons

Currently IWLive polygons can theme based on the most severe warning. We want an option to theme instead based on which polygon contains the most warnings, and potentially other options like the earliest warning.
Nathan Gerdts about 2 years ago in InfoWorks WS Pro 0 Under consideration

Smart meters

Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution ...
Guest almost 6 years ago in InfoWorks WS Pro / Data Exchange / Telemetry 2 Under consideration

Support variable speed in live data

Variable speed is now an unsupported attribute in live data.
Evi Loozen almost 6 years ago in InfoWorks WS Pro / Telemetry 2 Under consideration

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration