Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks WS Pro

Showing 7

Ability to configure Demand Area Analysis by ruby script

Currently the demand Area Analysis has to be dealt with manually but to be able to access, alter, edit, change etc. via ruby scripts would be very useful. Whether this is to set things up to automatically update profiles based on telemetry data fo...
Duncan Allen about 1 year ago in InfoWorks WS Pro / Automation 0 Launched

Time varying initial water age profile

As a user it would be great to be able to add a time varying initial water age profile for transfer nodes. This would allow us to assess water age within the distribution network without having to combine models.
Guest almost 5 years ago in InfoWorks WS Pro / Engine 1 Launched

Be able to experimental run simulation without commit in WS Pro

Be able to experimental runs simulation without commit in WS Pro
Guest over 4 years ago in InfoWorks WS Pro / Productivity 2 Launched

I want to combine the CLA with the generalised Multi Run in Infoworks WS Pro

I want to combine the CLA with the generalised Multi Run in Infoworks WS Pro. We use Critical link analyses. After these runs we analyse with script in exchange. As result we get of every pipe the maximum flow in relation with the isolation_area. ...
Erik Amting about 2 years ago in InfoWorks WS Pro 0 Launched

Boundary trace toolbar shortcut

I often use the boundary trace tool to understand the extent of a DMA/PMA. Currently, we have to go to Geoplan -> Tracing Tools -> Boundary Trace, and it would be a lot easier if it was available as a toolbar shortcut.
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 0 Launched

SQL Query and GIS

Two ideas: 1.GIS supported queries only work with .shp format. To avoid data transformations it would be useful to work with geodatabase feature classes too. 2. We would like to see all ICM GIS search types included in Infoworks WS Pro. We missed ...
Juan Carlos Ortega over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Launched

Add to the "Overwrite" action of the Data Import Center the option WITH and WITHOUT topology change.

Allow the option to overwrite attribute information without modifying the topological data of the objects,as InfoWorks ICM does.
Juan Carlos Ortega almost 2 years ago in InfoWorks WS Pro / Data Exchange 1 Launched